Tuesday, October 27, 2020, 08:40: Roughing.
Tuesday, October 27, 2020, 09:13: TP1B on.
Tuesday, October 27, 2020, 10:13: TP1A on.
Tuesday, October 27, 2020, 12:59: Vacuum @ 4.55e-06T
Tuesday, October 27, 2020, 13:01: Waterlines opened. Vacuum @ 4.26e-06T.
Tuesday, October 27, 2020, 13:03: Power / sources on.
Tuesday, October 27, 2020, 13:05: Optics on. IV4 open. TGHT / TBHT check ok.
Wednesday, October 28, 2020, 04:30: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.
Wednesday, October 28, 2020, 06:30:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
26.66 |
5.67 |
TBHT |
26.51 |
8.40
|
COIL + EE |
26.43 |
2.59 |
TGHT |
26.52 |
6.44 |
Wednesday, October 28, 2020, 06:42: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Wednesday, October 28, 2020, 07:33: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Wednesday, October 28, 2020, 13:03:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.25 |
6.62 |
TBHT |
26.90 |
9.27 |
COIL + EE |
26.68 |
3.08 |
TGHT |
26.88 |
6.85 |
Thursday, October 29, 2020, 15:19: HV to 0 kV. Begin auto-cooling @ 1 A per min.
Large Vacuum spike noted 5:30 approx. Tripped TS.
Monday, November 02, 2020, 08:32: Vacuum @ 2.65e-06T. PS/optics off (Sources already tripped)
Monday, November 02, 2020, 08:33: IV4 closed.
https://elog.triumf.ca/TIS/Test-Stand/818 - Leak Checks (FS#4 confirmed)
Monday, November 02, 2020, 09:27: IG1 off. Turbo pumps off.
Monday, November 02, 2020, 10:38: Venting. |