Message ID: 753     Entry time: Thursday, August 08, 2019, 09:12
Author: Aaron Schmidt 
Target/No.#:  
Source: LP-FEBIAD 
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#: 42752-7 
Status: In progress 
Subject: P2N Setup - LP-FEBIAD target 

Inserted a used (heating) LP-FEBIAD target with a basic heat shield assembly with no end plate foil on the window side to observe heating. The P2N Coil / TGHT connections were added.

Test whether the TS connections are affecting the P2N heating or if it's the P2N target itself.

-Heat the TGHT only, observe, then ramp down.

-Heat Coil only, observe, then ramp down.

-Heat TGHT w/ Coil, observe, then ramp down.

Note* Heating should be even across the target. Elog & take pictures.

NO HV ALLOWED!!!!

Thursday, August 08, 2019, 09:05: Roughing.

Thursday, August 08, 2019, 09:14: BV1A closed to allow pressure stabilization. Opened about within 2 seconds later with BV1B.

Thursday, August 08, 2019, 09:41: Turbo pumps on.

Thursday, August 08, 2019, 09:47: Ion gauge on.

Thursday, August 08, 2019, 10:37: RGA on.

TSG:CG1A & TSG:CG1B do not appear to be pumping down efficiently - May need to swap out TSG:RP1 after this test. Last done April 18, 2018. elog: 655.


Friday, August 09, 2019, 08:49: Power on.

Friday, August 09, 2019, 08:51: Waterlines opened. No response on RGA. Vacuum ok @ 3.03e-06T

Friday, August 09, 2019, 08:56: Auto-ramping TGHT  @ 4 @ per min to 150 A.

Friday, August 09, 2019, 10:10: Ramping the TGHT down from 150 A to 0A.

Friday, August 09, 2019, 10:39: Anode Current @ 200 mA w/ 19V? Anode PS on. Voltage & current dropped off.

Friday, August 09, 2019, 11:18: TGHT and TBHT power supplies ramped to 150A each, total of 300A in the target

Friday, August 09, 2019, 13:12:  Target glows symmetrically. TGHT and TBHT ramped from 150A to 200A each for a total of 400A on the target

Friday, August 09, 2019, 14:05: RGA error.

Friday, August 09, 2019, 14:08: RGA Restarted.

Friday, August 09, 2019, 14:08: Target heating evenly on total 400 A.

Friday, August 09, 2019, 15:57:  Auto-ramping TGHT/TBHT  @ 4 @ per min to 250/250 A.

Friday, August 09, 2019, 16:28: Vacuum limit reach at 241 and 238 A for TGHT and TBHT, respectively.

Friday, August 09, 2019, 16:28: Auto-cooling started at 4A/min


Monday, August 12, 2019, 09:22: Sources off. RGA off.

Monday, August 12, 2019, 10:04: Power off. Ion gauge off. Turbos off.

Attachment 1: 20190808_085752.jpg  1.698 MB  Uploaded Monday, August 12, 2019, 09:15  | Show | Show all
Attachment 2: 20190808_085758.jpg  1.711 MB  Uploaded Monday, August 12, 2019, 09:15  | Show | Show all
Attachment 3: 20190809_135736.jpg  1.999 MB  Uploaded Monday, August 12, 2019, 09:17  | Show | Show all
Attachment 4: 20190809_135747.jpg  759 kB  Uploaded Monday, August 12, 2019, 09:18  | Show | Show all
Attachment 5: 20190809_135820.jpg  646 kB  Uploaded Monday, August 12, 2019, 09:18  | Show | Show all
Attachment 6: Aug_2019_test_target_-_P2N_-_LP-FEBIAD_setup.docx  655 kB  Uploaded Monday, August 12, 2019, 10:22
Attachment 7: TS-2019-08-08-10-37.rga  839 kB  Uploaded Monday, August 12, 2019, 10:23
Attachment 8: TS-2019-08-09-14-07.rga  2.049 MB  Uploaded Monday, August 12, 2019, 10:23
ELOG V2.9.2-2455