Message ID: 751     Entry time: Wednesday, August 07, 2019, 08:18
Author: Luca Egoriti 
Target/No.#: P2N - 1 
Source:  
Station: ITE 
Module: TM2 
Target Oven W.O#:  
Heat Shield W.O#:  
Status: Problems/Solutions 
Subject: p2n heating test 4 

Tuesday, August 06, 2019, 16:00

Start ramp up to 300+300 = 600 A

 

Tuesday, August 06, 2019, 17:30

Target glowing, see images. Ramp down started
 
 

Wednesday, August 07, 2019, 08:11

The same p2n target was installed in the test stand, taking off the ion source since we thought it could have been shorting to the reference electrode and providing a return path for the current, hence generating the asymmetric heating that was noticed on the target.

On Tuesday 6th afternoon, the p2n was ramped up to 600 A (300 + 300 A from TGHT and TBHT in parallel). The target and its right flexible leg were still glowing. After noticing it, the current was ramped down wating to open up for inspection.