Message ID: 749     Entry time: Tuesday, July 30, 2019, 12:19
Author: Luca Egoriti 
Target/No.#: P2N - 1 
Source: HP-FEBIAD 
Station: ITE 
Module: TM2 
Target Oven W.O#:  
Heat Shield W.O#:  
Status: Problems/Solutions 
Subject: p2n heating test - target inspection 

The p2n target was taken out of the test stand for inspection. Comments and measurements on the container below:

- Initially, continuity measurements were mode between the target and heat shield (HS) while they were still in the test stand, and looks like they were shorted. However, after removing the HS from the test stand, no short was seen, not even after moving the target legs. Instead, we confirmed that the short was happening in the test stand, so some water lines were touching each other. 

- The target look in one piece, except for the ion source that came off right after manufacturing. (see picture)

- The insulator connecting the bottom section of the ion source central current lead, to the HS, was broken (see picture)

- The annular disc of the connecting the inner and outer tube of the ion source was bulging outwards, maybe the ion source was heating too much while we put current in it (see picture).

- The screw connecting the top part of the central ion source current lead, is now of a blue-ish color

 

 

Resistance measurementts:

- Copper to copper: 1008 microOhm

- Copper to bottom flexy leg: 101 microOhm

-  Bottom-to-top (flexy): 30-45 microOhm

- Target: 476 microOhm

- Copper to top flexy: 261 microOhm

- Copper to bottom flexy (left): 100 microOhm

- Copper to bottom flexy (right): 94 microOhm

- Top Flexy - botton target assy (left): 88 microOhm

 

 

From left to right:

- Cu to bottom flexy leg: 102

- Flexy bottom to flexy top: 31

- Flexy top left to flexy top right: 473

- Flexy top to flexy bottom: 0 (???)

- flexy bottom to Cu: 93

Attachment 1: IMG_20190730_110927.jpg  2.935 MB  Uploaded Tuesday, July 30, 2019, 14:29  | Show | Hide all
Attachment 2: IMG_20190730_113437.jpg  2.618 MB  Uploaded Tuesday, July 30, 2019, 14:30  | Show | Hide all
Attachment 3: IMG_20190730_105629.jpg  3.576 MB  Uploaded Tuesday, July 30, 2019, 14:31  | Hide | Hide all
IMG_20190730_105629.jpg
ELOG V2.9.2-2455