Message ID: 699     Entry time: Thursday, December 06, 2018, 11:02
Author: Aaron Schmidt 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status: Problems/Solutions 
Subject: FC0 Bellows Replacement. 

Thursday, December 06, 2018, 11:02: Turbo pumps (TP6 & TP2) off on beamline side. IG6 off.

Thursday, December 06, 2018, 14:06: Turbo pumps restarted. FC0 bellows replacement to occur Monday.


Monday, December 10, 2018, 11:00: Vented on beam side of IV4. Turbo pumps & backing valves closed preemptively on chamber side due to shared airlines.

Pulled FC0, disassemble, check, clean, remove / install bellows, Re-align, assemble.

Monday, December 10, 2018, 12:52: Re-installed repaired FC0. Roughing beam side. Chamber side turbos back on.

Monday, December 10, 2018, 13:48: Turbo pumps on.

Monday, December 10, 2018, 13:51: Ion gauge on. IG6 @ 5.73e-06T and still dropping.


Tuesday, December 11, 2018, 09:26: IG6 Vacuum @ 3.56e-07T. Connected cables.

Tuesday, December 11, 2018, 09:27: Drive out FC0. Vacuum @ 3.75e-07T. Ok. Setup LD & drive FC0 back in.

Tuesday, December 11, 2018, 09:32:  LD baseline before opening valve to beam line turbo & RP pumps: below 0.0e-09 T-l/sec

Tuesday, December 11, 2018, 09:36: Full open base, FC0 in:

Vacuum @ 3.56e-07T.

LD:  0.0e-09 atm-cc/sec

Spray w/ He:

No change.

Tuesday, December 11, 2018, 09:42: FC0 out:

Vacuum @ 3.60e-07T.

LD: 0.0e-09 atm-cc/sec.

Spray w/ He:

No Change. Sprayed all flanges and seals all around FC0 and it's connection to the beam line. OK.

Tuesday, December 11, 2018, 09:46: Closed FC0 & line to the turbo & RP pumps. LD off.

FC0 Bellows replacement a success.

More pictures uploaded to Docushare.

 Home  --->  ISAC Test Stand  Contains  Test Stand Refurbishing  Contains  FC0 Bellows Replacement Listing

Attachment 1: 20181206_Old_Bellows.jpg  932 kB  Uploaded Tuesday, December 11, 2018, 10:37  | Show | Show all
Attachment 2: 20181210_112528.jpg  1.654 MB  Uploaded Tuesday, December 11, 2018, 10:38  | Show | Show all
Attachment 3: 20181210_115310.jpg  1.687 MB  Uploaded Tuesday, December 11, 2018, 10:38  | Show | Show all
Attachment 4: 20181211_New_Bellows_installed.jpg  942 kB  Uploaded Tuesday, December 11, 2018, 10:38  | Show | Show all