TM2 Source tray still in.
Thursday, June 07, 2018, 09:20: Roughing.
Thursday, June 07, 2018, 12:42: Turbo pumps started.
Friday, June 08, 2018, 08:00: Anode run to 15 A. Short still apparent.
Friday, June 08, 2018, 08:12: Ion gauge, Turbos off.
Friday, June 08, 2018, 08:55: Venting.
Friday, June 08, 2018, 09:45: Anode connection investigated. Short found on the bracket once the anode wire was disconnected from the back screw (Picture)
Friday, June 08, 2018, 10:00: Removed 9-pin bracket. (Top connector left connected to TS. (Picture)
New Anode 9-pin connection/wire to be installed on the bracket. Test in the cold lab.
Friday, June 08, 2018, 10:12: Roughing.
Friday, June 08, 2018, 11:14: Turbo pumps started.
Friday, June 08, 2018, 12:31: Ion gauge on.
Tuesday, June 12, 2018, 06:18: Ion gauge & Turbo pumps off.
Tuesday, June 12, 2018, 07:40: Venting. |