Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 647     Entry time: Monday, March 12, 2018, 10:44
Author: Carla Babcock 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status:  
Subject: Bringing up HV with gas on 

Pressure:

Previous HV tests done at 2e-7 pressure.
Current pressure 1.1e-6 (see previous entry for RGA stats) - first attachment shows source gas setup. Argon, neon and He leaks all on.

 

Ramping up:

  • Second attachment - bias at 50kV
  • Third attachment - bias at 60kV
  • Fourth attachment - bias at 65kV

Pressure has been slowly falling since we started this test - now down to 8.7e-7

 

Spark after 10 mins, see attachment 5. Very slight vacuum jump (8.5e-7 -> 1.2e-6) and bias current jump (36uA -> 113uA). Tripped TP6 and the steerers, as usual. Bias current read back more erratic afterwards (see sixth attachment).

System has been stable for 20mins, though current on bias is still more erratic than before the spark. Increasing He leak rate from 7 to 7.06 to bring vacuum back up to 2e-6 (see attachment 7). No effect from increased pressure.


Tuesday, March 13, 2018, 05:52: Power off.

Tuesday, March 13, 2018, 05:56: Waterlines purged

Tuesday, March 13, 2018, 05:57: Ion gauge, Turbos off.

Attachment 1: sourcegascontrol_12032018.PNG  13 kB  Uploaded Monday, March 12, 2018, 11:48  | Show | Hide all
Attachment 2: striptool_12032018.PNG  23 kB  Uploaded Monday, March 12, 2018, 11:49  | Show | Hide all
Attachment 3: striptool_12032018_1042.PNG  25 kB  Uploaded Monday, March 12, 2018, 11:49  | Show | Hide all
Attachment 4: striptool_12032018_1050.PNG  22 kB  Uploaded Monday, March 12, 2018, 11:51  | Show | Hide all
Attachment 5: spark_12032018_1058.PNG  23 kB  Uploaded Monday, March 12, 2018, 11:58  | Show | Hide all
Attachment 6: biascurrent_12032018_1104.PNG  24 kB  Uploaded Monday, March 12, 2018, 12:04  | Show | Hide all
Attachment 7: striptool_12032018_1126.PNG  24 kB  Uploaded Monday, March 12, 2018, 12:27  | Hide | Hide all
striptool_12032018_1126.PNG
Attachment 8: 2018_HV_test_w-gas.docx  234 kB  Uploaded Tuesday, March 13, 2018, 06:51
ELOG V2.9.2-2455