Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 644     Entry time: Thursday, March 08, 2018, 17:47
Author: Carla Babcock 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status:  
Subject: Change of electronics on target and tube power supplies 

The resistor/varistor combinations across the target + / -, tube + / - and target- / tube + have been remade and moved to the back of the power supplies to limit the corona discharges at higher voltages. Pictures attached.

Attachment 1: IMG_20180308_152637.jpg  113 kB  | Show | Hide all
Attachment 2: IMG_20180308_152645.jpg  114 kB  | Hide | Hide all
IMG_20180308_152645.jpg
Attachment 3: TargetNeg.jpg  234 kB  | Show | Hide all
Attachment 4: TubeNegPos.jpg  218 kB  | Show | Hide all
ELOG V2.9.2-2455