Message ID: 640     Entry time: Monday, February 26, 2018, 09:13
Author: Carla Babcock 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status:  
Subject: Running list of changes to the ISAC test stand for >60kV operation 

1. Al corona shield installed over end of the HV duct to suppress discharges from the sharp edge of the duct.

2. Some moving and shortening of cables to keep them from running close to different voltages.

3. Changed the angle bracket on the 3M bias-EE resistor chain to a plate, same position.

4. Moved the 164K EE resistor chain to sit flat against feedthrough K.

5. Moved the bias-EE spark gap to sit flat against the back of feedthrough K, required tapping a hole in the back of the copper clamp.

6. Cap and top of rack vacuumed.

7. Piece of shielding removed from top of HV rack

Attachment 1: Corona_1.jpg  834 kB  Uploaded Wednesday, February 28, 2018, 08:18  | Show | Hide all
Attachment 2: Corona_2.jpg  1.031 MB  Uploaded Wednesday, February 28, 2018, 08:18  | Show | Hide all
Attachment 3: Brackets_and_Boards_before_1.jpg  2.121 MB  Uploaded Wednesday, February 28, 2018, 08:18  | Show | Hide all
Attachment 4: Brackets_and_Boards_before_2.jpg  1.131 MB  Uploaded Wednesday, February 28, 2018, 08:18  | Show | Hide all
Attachment 5: Brackets_and_Boards_After_1.jpg  1.186 MB  Uploaded Wednesday, February 28, 2018, 08:18  | Show | Hide all
Attachment 6: Brackets_and_Boards_After_2.jpg  1002 kB  Uploaded Wednesday, February 28, 2018, 08:19  | Hide | Hide all
Brackets_and_Boards_After_2.jpg
ELOG V2.9.2-2455