Message ID: 616     Entry time: Monday, December 04, 2017, 08:29
Author: Aaron Schmidt 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status: Problems/Solutions 
Subject: Power outage 

Power outage over the weekend. Reboot PLC and systems.

Monday, December 04, 2017, 08:22: Turbo pumps TMS:TP6 & TP2 Restarted.

Monday, December 04, 2017, 08:28: Time out on turbo pump TP1B.

Monday, December 04, 2017, 09:25: Turn off/restart TSG:TP1B Maincontrol.

Monday, December 04, 2017, 09:26: TMS:IG6 Restarted.

Monday, December 04, 2017, 14:24: Multi gauge controller to TSG:IG1 burned out. Replaced. Vacuum @ 4.45e-06T. Monitor.

Attachment 1: 20171205_103324.jpg  1.191 MB  Uploaded Friday, December 08, 2017, 10:07  | Hide | Hide all