Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 580     Entry time: Tuesday, May 02, 2017, 14:03
Author: Aaron Schmidt 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status:  
Subject: Pump down empty chamber. (FS#3 out) 

Check to fit lines FS#3

Tuesday, May 02, 2017, 14:00: Rouging. 


Wednesday, May 03, 2017, 07:07: Venting.

Check final fit. Mark up FS#3.

Wednesday, May 03, 2017, 08:11: Roughing.

Wednesday, May 03, 2017, 12:42: Venting.


Thursday, May 04, 2017, 13:35: FS#3 re-installed.

Thursday, May 04, 2017, 13:47: Roughing  w/ UC#20 IG-LIS heat shield.

Attachment 1: 20170504_133718.jpg  1.203 MB  Uploaded Thursday, May 04, 2017, 15:54  | Show | Hide all
Attachment 2: 20170504_133723.jpg  2.441 MB  Uploaded Thursday, May 04, 2017, 15:54  | Show | Hide all
Attachment 3: 20170504_133728.jpg  2.030 MB  Uploaded Thursday, May 04, 2017, 15:54  | Hide | Hide all
20170504_133728.jpg
Attachment 4: 20170504_133735.jpg  1.846 MB  Uploaded Thursday, May 04, 2017, 15:54  | Show | Hide all
ELOG V2.9.2-2455