Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 408     Entry time: Friday, October 31, 2014, 14:57
Author: Anders Mjos 
Target/No.#:  
Source: LP-FEBIAD 
Station:  
Module:  
Target Oven W.O#: Tube only 
Heat Shield W.O#: 38307-9 
Status: In progress 
Subject: Test 

Friday, October 31, 2014, 14:47: Starting turbos

Friday, October 31, 2014, 14:57: Turbos at speed. Vacuum at 2.9E-5 T


Monday, November 03, 2014, 10:08 : Opened HS water circuit. Vacuum stable at 1.7E-7 T

Monday, November 03, 2014, 10:22: Starting auto ramping to 228A on TBHT at 1 A/min

Monday, November 03, 2014, 13:44: Target at temperature. Opening IV4.

Monday, November 03, 2014, 14:45: IV4 closed

Monday, November 03, 2014, 15:00: Starting cool down. 1 A/min 

Attachment 1: test20141103.png  50 kB  Uploaded Monday, November 03, 2014, 15:08  | Show | Hide all
Attachment 2: test20141103-2.png  55 kB  Uploaded Monday, November 03, 2014, 15:08  | Hide | Hide all
test20141103-2.png
ELOG V2.9.2-2455