Message ID: 359     Entry time: Wednesday, February 05, 2014, 11:27
Author: Anders Mjos 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status: Problems/Solutions 
Subject: Emittance Rig installation 

Wednesday, February 05, 2014, 11:27 : Stopped turbos

  • 2x spacers ITD0468 1/8" THK installed to shift the wire scanner screen closer to the wire scanner. (ITD0469 1/16" THK spacers not used).
  • Emittance Rig installed. Manually actuated from out -> in -> out position. No interference observed.
  • Replaced two insulators on wire scanner screens that broke in the installation process. New insulators kindly donated from ISIS.

By Anders and Ayan.

Wednesday, February 05, 2014, 16: Roughing


Thursday, February 06, 2014, 08:42: Turbos started

Thursday, February 06, 2014, 08:50: Turbos at speed. IG6 6.2E-6 T, IG1 1.3 E-6 T

Attachment 1: Spacers_Installed.jpg  1.516 MB  Uploaded Thursday, February 06, 2014, 10:57  | Hide | Hide all
Spacers_Installed.jpg
Attachment 2: Emittance_Rig_Inside.jpg  1.460 MB  Uploaded Thursday, February 06, 2014, 10:57  | Show | Hide all
Attachment 3: Emittance_Rig_Outside.jpg  1.999 MB  Uploaded Thursday, February 06, 2014, 10:57  | Show | Hide all
ELOG V2.9.2-2455