Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 321     Entry time: Tuesday, July 16, 2013, 16:01
Author: Anders Mjos 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status: Problems/Solutions 
Subject: FEBIAD coil connector insulator fracture 

The right side of the insulator cracked/fractured either as the bolt was tightened or loosened. 

Attachment 1: Photo_2013-07-16_3_36_45_PM.jpg  1.982 MB  | Hide | Hide all
Photo_2013-07-16_3_36_45_PM.jpg
ELOG V2.9.2-2455