Message ID: 296     Entry time: Thursday, April 25, 2013, 13:32
Author: Anders Mjos 
Target/No.#: Empty 
Source: LP-FEBIAD 
Station:  
Module:  
Target Oven W.O#: Tube Only 
Heat Shield W.O#: 38307-9  
Status: In progress 
Subject: FEBIAD Coil test 

Same target as in e-log entry https://elog.triumf.ca/TIS/Test-Stand/106

Thursday, April 25, 2013, 13:54: Roughing

Thursday, April 25, 2013, 14:25: Started turbos 

Thursday, April 25, 2013, 14:33: Turbos at speed

Thursday, April 25, 2013, 14:33: Vacuum at 8.8E-6 T


Friday, April 26, 2013, 08:25: Cooling water supply opened. Vacuum stable at 2.2E-7 T

Friday, April 26, 2013, 13:35: Gas lines evacuated.

Testing Coil current vs Temperature before heating

COIL:RDCUR at 1.95A
COIL:RDVOL at 1.47V
COIL T/C at 86 deg C and still slowly increasing


Tuesday, April 30, 2013

Testing Coil current vs Temperature before heating

COIL:RDCUR at 3.96A

COIL:RDVOL 3.2 V Vacuum starts to increase (base 1.4E-7

COIL:RDVOL 3.8 V T/C at 150 C vacuum at 5E-7

COIL:RDCUR at 3.47A to reduce out-gassing T/C at 175 C

Tuesday, April 30, 2013, 12:39

COIL:RDCUR at 3.96A T/C 225 C

COIL:RDVOL 5.0 V T/C at 250 C vacuum at 6.2E-7

Tuesday, April 30, 2013, 13:00

COIL:RDCUR at 4.25A COIL:RDVOL at 5.7V T/C 290 C

Tuesday, April 30, 2013, 13:10

COIL:RDCUR at 4.15A COIL:RDVOL at 5.75V T/C 310 C

Tuesday, April 30, 2013, 14:53

COIL:RDCUR at 4.15A COIL:RDVOL at 5.85V T/C 320 C

Tuesday, April 30, 2013, 16:30

COIL:RDCUR at 4.15A COIL:RDVOL at 5.89V T/C 328 C


Wednesday, May 01, 2013, 08:16

COIL:RDCUR at 4.15A COIL:RDVOL at 5.95V T/C 350 C - P/S is voltage limited at 5.95V

Ramping down current to 0. T/C logger is required elsewhere.


Friday, May 03, 2013, 12:07: Pumping out gas line through vacuum chamber.

The anode cable has been reconnected (see e-log entry 297)

Friday, May 03, 2013, 14:17: BIAS and EE to 30kV and -800V

Friday, May 03, 2013, 14:24: Started heating TBHT to 280A at 1A/min


Monday, May 06, 2013, 08:46: TBHT @ 276A, Voltage limiting at 2.5V. Increased limit to 2.7V. TGHT to 280A and 2.52V. COIL temp ~100C

Monday, May 06, 2013, 09:48: COIL:RDCUR at 2.93A

Monday, May 06, 2013, 10:34: Coil temp ~240C. Increasing COIL:RDCUR to 3.52A COIL:RDVOL at 4.1V

Monday, May 06, 2013, 11:48: Coil temp 330C COIL:RDCUR at 3.52A RDVOL at 4.9V

Monday, May 06, 2013, 11:54: COIL:RDCUR at 3.9A

Monday, May 06, 2013, 12:56: RDVOL at 5.9V. Coil temp ~380C

Monday, May 06, 2013, 13:47: Cooling down target to correct anode connection.


Tuesday, May 07, 2013, 08:47: De-biased

Tuesday, May 07, 2013, 10:06: Corrected el. connections to cathode floating. Started tube heating to 280A


Wednesday, May 08, 2013, 12:12: De-biased

Wednesday, May 08, 2013, 12:12: Cooling down cathode 1A/min


Thursday, May 09, 2013, 15:22: TPS:IV4 closed

Attachment 1: 2014-04-30_FEBIAD_COIL_AWG18.PNG  33 kB  Uploaded Tuesday, April 30, 2013, 15:54  | Show | Hide all
Attachment 2: 2014-05-01_FEBIAD_COIL_AWG18.PNG  31 kB  Uploaded Wednesday, May 01, 2013, 09:17  | Show | Hide all
Attachment 3: Target_Assembly.pdf  231 kB  Uploaded Thursday, May 02, 2013, 12:23  | Hide | Hide all
Target_Assembly.pdf