Entry  Thursday, January 17, 2013, 08:16, Sebastian Raeder, RFQ empty, , , , , , In progress, heating 
    Reply  Friday, January 18, 2013, 16:17, Anders Mjos, RFQ empty, , , , , , In progress, heating Test_Stand_cooling_temp_data_2013-01-16.pdfTest_Stand_strip_tool_TGHT_CUR_2013-01-16.PNG
Message ID: 276     Entry time: Friday, January 18, 2013, 16:17     In reply to: 272
Author: Anders Mjos 
Target/No.#: RFQ empty 
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status: In progress 
Subject: heating 

 

Sebastian Raeder wrote:

Thursday, January 17, 2013, 08:16: started heating of the target, vacuum at 2.6E-7T

 Thursday, January 17, 2013, 14:55: current at 572A/6.95V (panel reading), vacuum at 6.7E-7T

Thursday, January 17, 2013, 18:40: measurements done, vacuum at 5.3E-7T, current 572V/6.94V, start cooling down

 

 The temperature of the cooling water was logged during this test. See attachments for details. Note that current and voltage read back is not available due to trouble with the power supply. One thermocouple (Heat Shield circuit) came loose before the end of the test (not shown in plot).

Attachment 1: Test_Stand_cooling_temp_data_2013-01-16.pdf  101 kB  | Hide | Hide all