Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 8 of 8  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
Entry  Tuesday, March 05, 2024, 10:15, Aaron Schmidt, Ta, LP-SIS, , , 45447-15, , Ready, Ta# (March stock) Target Description. 

Tuesday, March 05, 2024, 10:12: Ta# (Stock - Loaded today) LP-SIS target description: 

Total Ta foils = 470 [6x20 packs + 350 single discs]

Foil Thickness = 0.033mm (0.0013") avg Measured. 

Target material batch: Ta 2023-1  Mt'l PO# TR-2022-03028

Target density = 18.2 g/cm3

Target length = 3.4 cm

Total Mass = 61.9 g [Incl foils + Ta wire on 6 packs]

Total mass w/ Target oven =  459.6 g (w/ end caps)

Discs in target are arranged as follows: 1pack / 75 singles / 1pack / 100 singles / 2packs / 100 singles / 1pack / 75 singles / 1pack

Dimpling direction on foils/ Packs.                                                               --> Center <--

End caps installed (Not expanded). No Ta foil heat shield added.

Entry  Wednesday, May 22, 2024, 22:32, Darwin Ortiz Rosales, UCx#45, LP-SIS, , , 45220-9, , Ready, UCx#45_Description UCx#45_Description.png
 
Entry  Tuesday, September 03, 2024, 16:11, Darwin Ortiz Rosales, TiC#8, HP-FEBIAD, , , 45447-2, , Ready, TiC#8_Description TiC#8_(2).png

This was back-up target

Entry  Tuesday, November 12, 2024, 12:49, Darwin Ortiz Rosales, UCx#46, LP-IG-LIS, , , 42218-2, , Ready, UCx#46_Description UCx#46_Description.png
 
Entry  Thursday, January 02, 2025, 12:54, Darwin Ortiz Rosales, UCx#47, LP-SIS, , , 45447-12, , Ready, UCx#47_Description UCx#47_Description.png
 
ELOG V2.9.2-2455