Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 6 of 8  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Authordown Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject
  121   Tuesday, August 16, 2022, 09:48 Darwin Ortiz RosalesSiC#44HP-FEBIAD  37978-1 ReadyTarget SiC#44 Description

Tuesday, August 16, 2022, 09:47

  122   Thursday, September 22, 2022, 13:18 Darwin Ortiz RosalesC#4LP-SIS  44691-3 ReadyTarget C#4 Description

Thursday, September 22, 2022, 13:17

Attachment 1: C#4_Target_Description.png
C#4_Target_Description.png
  123   Tuesday, October 25, 2022, 13:10 Darwin Ortiz RosalesUCx#40LP-SIS  45550-2 ReadyUCx#40 Target Description

Tuesday, October 25, 2022, 13:10

Target in Glovebox

Attachment 1: UCx#40_Description.png
UCx#40_Description.png
  124   Tuesday, November 15, 2022, 08:41 Darwin Ortiz RosalesUCx#41LP-SIS  45220-13 Ready 
Attachment 1: UCx#41_Description.png
UCx#41_Description.png
  125   Wednesday, December 14, 2022, 10:28 Darwin Ortiz RosalesC#5   44691-13 ReadyTarget C#5 Description

Graphite target

Attachment 1: C#5_Description.png
C#5_Description.png
  126   Monday, February 06, 2023, 10:02 Darwin Ortiz RosalesC#6   45220-6 ReadyTarget C#6 Description
Attachment 1: C#6_Description.png
C#6_Description.png
  129   Monday, May 01, 2023, 14:59 Darwin Ortiz RosalesTiC #5LP-FEBIAD  44692-5 ReadyTarget TiC #5 Description
Attachment 1: TiC#5.png
TiC#5.png
  130   Friday, May 26, 2023, 11:35 Darwin Ortiz RosalesTiC#6HP-SIS  44692-10 ReadyTarget TiC #6 Description
Attachment 1: TiC_#6.png
TiC_#6.png
  131   Friday, May 26, 2023, 11:53 Darwin Ortiz RosalesSiC#45HP-SIS  44692-3 Ready 
Attachment 1: SiC#45.png
SiC#45.png
  133   Wednesday, July 26, 2023, 09:42 Darwin Ortiz RosalesUCx#42LP-SIS  45220-1 ReadyUCx#42_Description
Attachment 1: UCx#42_Description.png
UCx#42_Description.png
  134   Wednesday, July 26, 2023, 12:03 Darwin Ortiz RosalesUCx#43LP-SIS  45447-11 ReadyUCx#43_Description
Attachment 1: UCx#43_Description.png
UCx#43_Description.png
  138   Tuesday, October 24, 2023, 11:30 Darwin Ortiz RosalesUCx#44LP-FEBIAD  41790-7 ReadyUCx#44_Description

Three Ta heatshields left installed on container.

Attachment 1: UCx#44_Description.png
UCx#44_Description.png
  140   Wednesday, May 22, 2024, 22:32 Darwin Ortiz RosalesUCx#45LP-SIS  45220-9 ReadyUCx#45_Description
Attachment 1: UCx#45_Description.png
UCx#45_Description.png
  141   Friday, June 14, 2024, 14:12 Darwin Ortiz RosalesSiC#46HP-SIS  44692-245235-6ReadySiC#46_description
Attachment 1: SiC#46.png
SiC#46.png
  142   Friday, June 14, 2024, 14:16 Darwin Ortiz RosalesTiC#7HP-FEBIAD  45447-545235-15ReadyTiC#7_Description

Please note that this target comes in a Graphite cartridge.

Attachment 1: TiC#7.png
TiC#7.png
  144   Tuesday, September 03, 2024, 16:11 Darwin Ortiz RosalesTiC#8HP-FEBIAD  45447-2 ReadyTiC#8_Description

This was back-up target

Attachment 1: TiC#8_(2).png
TiC#8_(2).png
  145   Tuesday, September 10, 2024, 09:53 Darwin Ortiz RosalesTiC#9HP-SIS  45447-2945235-19ReadyTiC#9_Description
Attachment 1: TiC#9.png
TiC#9.png
  148   Tuesday, November 12, 2024, 12:49 Darwin Ortiz RosalesUCx#46LP-IG-LIS  42218-2 ReadyUCx#46_Description
Attachment 1: UCx#46_Description.png
UCx#46_Description.png
  149   Thursday, January 02, 2025, 12:54 Darwin Ortiz RosalesUCx#47LP-SIS  45447-12 ReadyUCx#47_Description
Attachment 1: UCx#47_Description.png
UCx#47_Description.png
  15   Friday, September 23, 2011, 17:03 Anders MjosSiC#26HP-FEBIADITETM438295-938307-8SpentRun finished

Friday, September 23, 2011, 16:54:

  • Cu-gaskets used for leak checking target had a leak rate of about  10-8  10-9 atm cc/sec. Replaced with silver plated SS gaskets and no leak detected above 10-11 atm cc/sec.
  • The target can not hold high voltage when it is sitting on the jig. The insulator on the jig have reduced resistance over time (less than 1 G Ohm). All high voltage tests passed when target is tested not sitting on the jig.

 

  • Target is now in the test stand and pumping down.
ELOG V2.9.2-2455