Entry  Tuesday, September 06, 2011, 13:19, John Wong, TaC#1, LP-SIS, ITE, TM1, 38634-6, , Spent, Target is done TaC_density_measurements.xls

Tuesday, September 06, 2011, 13:14: 

Average mass = 0.206g

Average Thickness = 0.0189 cm

Area of D-shaped disc = 2.21 cm2

D-shape discs diameter = 18.5mm (14.5mm cut-out length)

Oven ID, L= 18.22mm, R = 18.20mm 

Density = 4.9266 g/cm3

% Yield Density = 47.20%

Attachment#1 - TaC density measurements.

 Loaded target with 125 discs --> 9.6g Ta/cm2

Total discs mass = 30.41g

Total length = 4.5 cm


 Thursday, September 15, 2011, 10:45

Na & Li were added.

Re foil inserted.

No Ta-heat shields required.


Friday, September 30, 2011, 14:10

After the test-stand, 10uL of Na and Li were added yesterday.   

Target is now ready, and will be moved into the hotcell next week. 


Wednesday, November 16, 2011, 15:51 

After the target was finished and transferred into the hotcell, it was found that the target broke apart from the center block.  This might have happened during the end of the target cooldown. See link for more details: 

http://documents.triumf.ca/docushare/dsweb/View/Collection-7438


 

 

Entry  Wednesday, July 06, 2011, 14:13, John Wong, Ta#40, HP-SIS, , , 38295-4, , Spent, Target description  

Details about Ta Hp surface, w.o#38295-4 (spare):

This target was built as a spare.

 

Note: Left side target arm replaced, Nov 18, 2010.  Weld prep on centre block misaligned.  (Marik has more details about this).

Packs of Ta foils were prepared by JW. 

Target was filled with 400 of 0.025mm foils (25 foils/pk) in 4.0cm length. 

Total Mass of 16 packs of Ta foils + Ta wires = 42.70g.  

See attachment#1 for the measurement.

 


Friday, April 19, 2013, 09:44 

Target was tested at the Teststand.  Result Good. 

Ready for use.


 

Entry  Monday, August 16, 2021, 11:02, John Wong, UCx#34, LP-SIS, ITW, TM2, 44691-5, 44378-1, Ready, Target description  UCx#34_target_description.PNGUCx_34_SEM_Density_Measurements.pdf

Monday, August 16, 2021, 11:01

See attachments for the target description and SEM images


 

Entry  Tuesday, July 30, 2019, 15:52, Darwin Ortiz Rosales, ZrC#8, LP-SIS, ITE, TM2, 43044-5, , Ready, Target description ZrC8.pngZrC_8_SEM.pdf

 

Tuesday, July 30, 2019, 15:50

See attachment for details


Thursday, August 01, 2019, 07:41

See attachment#2 for SEM - JW

 

 

 

Entry  Friday, May 26, 2023, 11:35, Darwin Ortiz Rosales, TiC#6, HP-SIS, , , 44692-10, , Ready, Target TiC #6 Description TiC_#6.png
 
Entry  Monday, May 01, 2023, 14:59, Darwin Ortiz Rosales, TiC #5, LP-FEBIAD, , , 44692-5, , Ready, Target TiC #5 Description TiC#5.png
 
Entry  Tuesday, August 16, 2022, 09:48, Darwin Ortiz Rosales, SiC#44, HP-FEBIAD, , , 37978-1, , Ready, Target SiC#44 Description 

Tuesday, August 16, 2022, 09:47

Entry  Monday, June 20, 2022, 10:35, Darwin Ortiz Rosales, SiC#43, HP-FEBIAD, , , 42464-1, , Ready, Target SiC#43 Description 

Monday, June 20, 2022, 10:33

Entry  Wednesday, May 25, 2022, 10:15, Darwin Ortiz Rosales, SiC#42, HP-FEBIAD, , , 44692-9, , Ready, Target SiC#42 Description Description-SiC#42.png

Wednesday, May 25, 2022, 10:15

Entry  Monday, September 13, 2021, 14:53, Darwin Ortiz Rosales, SiC#41, HP-SIS, , , 42218-7, , Ready, Target SiC#41 Description Screenshot_2021-09-13_144830.png

Monday, September 13, 2021, 14:52

Entry  Wednesday, April 15, 2020, 08:10, Darwin Ortiz Rosales, SiC#40, HP-SIS, , , 42218-8, , Ready, Target SiC#40 Description Annotation_2020-04-15_080836.png

Wednesday, April 15, 2020, 07:51

See attached picture for description 

Entry  Friday, November 29, 2019, 10:53, Darwin Ortiz Rosales, SiC#39, HP-FEBIAD, , TM2, 42464-3, , Ready, Target SiC#39 Description SiC#39_description.PNGSiC39_SEM.pdf

Friday, December 06, 2019, 15:34

Added SEM images (see attachment#2) - JW


 

Entry  Friday, October 11, 2019, 09:26, Darwin Ortiz Rosales, SiC#38, HP-FEBIAD, , TM2, 42464-4, , Ready, Target SiC#38 Description SiC#38.PNG

Friday, October 11, 2019, 09:25

See attached picture for description.

 

Entry  Friday, March 10, 2023, 07:21, Aaron Schmidt, , , , , , , Ready, Target Material Batch - Ta Ta_2023_-_01.pdf

 Tantalum - Standard foils.

MTR PO: TR-2022-03028

Average foil thickness: 0.0013"

Entry  Monday, March 31, 2014, 15:02, John Wong, TiC#4, HP-SIS, , , 38817-8, 39956-10, Spent, Target Description  TiC#4_description.JPG

 Monday, March 31, 2014, 15:00

Target consists of 360 discs of TiC + graphite foils. 

Total length = 11.7cm 

Total green mass = 40.945g

(see attachment for more details) 


 

 

Entry  Monday, February 06, 2023, 10:02, Darwin Ortiz Rosales, Target Reassigned (VOID ENTRY), , , , 45220-6, , Ready, Target C#6 Description C#6_Description.png
 
Entry  Wednesday, December 14, 2022, 10:28, Darwin Ortiz Rosales, Target reassigned (VOID ENTRY), , , , 44691-13, , Ready, Target C#5 Description C#5_Description.png

Graphite target

Entry  Thursday, September 22, 2022, 13:18, Darwin Ortiz Rosales, C#4, LP-SIS, , , 44691-3, , Ready, Target C#4 Description C#4_Target_Description.png

Thursday, September 22, 2022, 13:17

Entry  Tuesday, September 29, 2020, 11:50, Marla Cervantes, C#2, LP-SIS, ITW, TM2, 44139-9, , In progress, Target C#2 Description  C2-Description.JPG

 Tuesday, September 29, 2020, 11:49

See attached picture for description 

Entry  Thursday, June 04, 2020, 15:00, Marla Cervantes, C#1, LP-SIS, , , 43044-8, , In progress, Target C#1 Description C1-Description.PNG

 Thursday, June 04, 2020, 15:00

See attached picture for description 