Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 4 of 8  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subjectdown
  109   Monday, August 16, 2021, 11:02 John WongUCx#34LP-SISITWTM244691-544378-1ReadyTarget description

Monday, August 16, 2021, 11:01

See attachments for the target description and SEM images


 

Attachment 1: UCx#34_target_description.PNG
UCx#34_target_description.PNG
Attachment 2: UCx_34_SEM_Density_Measurements.pdf
UCx_34_SEM_Density_Measurements.pdf UCx_34_SEM_Density_Measurements.pdf UCx_34_SEM_Density_Measurements.pdf UCx_34_SEM_Density_Measurements.pdf UCx_34_SEM_Density_Measurements.pdf UCx_34_SEM_Density_Measurements.pdf UCx_34_SEM_Density_Measurements.pdf UCx_34_SEM_Density_Measurements.pdf
  91   Tuesday, July 30, 2019, 15:52 Darwin Ortiz RosalesZrC#8LP-SISITETM243044-5 ReadyTarget description

 

Tuesday, July 30, 2019, 15:50

See attachment for details


Thursday, August 01, 2019, 07:41

See attachment#2 for SEM - JW

 

 

 

Attachment 1: ZrC8.png
ZrC8.png
Attachment 2: ZrC_8_SEM.pdf
ZrC_8_SEM.pdf ZrC_8_SEM.pdf ZrC_8_SEM.pdf ZrC_8_SEM.pdf ZrC_8_SEM.pdf
  130   Friday, May 26, 2023, 11:35 Darwin Ortiz RosalesTiC#6HP-SIS  44692-10 ReadyTarget TiC #6 Description
Attachment 1: TiC_#6.png
TiC_#6.png
  129   Monday, May 01, 2023, 14:59 Darwin Ortiz RosalesTiC #5LP-FEBIAD  44692-5 ReadyTarget TiC #5 Description
Attachment 1: TiC#5.png
TiC#5.png
  121   Tuesday, August 16, 2022, 09:48 Darwin Ortiz RosalesSiC#44HP-FEBIAD  37978-1 ReadyTarget SiC#44 Description

Tuesday, August 16, 2022, 09:47

  117   Monday, June 20, 2022, 10:35 Darwin Ortiz RosalesSiC#43HP-FEBIAD  42464-1 ReadyTarget SiC#43 Description

Monday, June 20, 2022, 10:33

  115   Wednesday, May 25, 2022, 10:15 Darwin Ortiz RosalesSiC#42HP-FEBIAD  44692-9 ReadyTarget SiC#42 Description

Wednesday, May 25, 2022, 10:15

Attachment 1: Description-SiC#42.png
Description-SiC#42.png
  110   Monday, September 13, 2021, 14:53 Darwin Ortiz RosalesSiC#41HP-SIS  42218-7 ReadyTarget SiC#41 Description

Monday, September 13, 2021, 14:52

Attachment 1: Screenshot_2021-09-13_144830.png
Screenshot_2021-09-13_144830.png
  99   Wednesday, April 15, 2020, 08:10 Darwin Ortiz RosalesSiC#40HP-SIS  42218-8 ReadyTarget SiC#40 Description

Wednesday, April 15, 2020, 07:51

See attached picture for description 

Attachment 1: Annotation_2020-04-15_080836.png
Annotation_2020-04-15_080836.png
  97   Friday, November 29, 2019, 10:53 Darwin Ortiz RosalesSiC#39HP-FEBIAD TM242464-3 ReadyTarget SiC#39 Description

Friday, December 06, 2019, 15:34

Added SEM images (see attachment#2) - JW


 

Attachment 1: SiC#39_description.PNG
SiC#39_description.PNG
Attachment 2: SiC39_SEM.pdf
SiC39_SEM.pdf SiC39_SEM.pdf SiC39_SEM.pdf SiC39_SEM.pdf
  94   Friday, October 11, 2019, 09:26 Darwin Ortiz RosalesSiC#38HP-FEBIAD TM242464-4 ReadyTarget SiC#38 Description

Friday, October 11, 2019, 09:25

See attached picture for description.

 

Attachment 1: SiC#38.PNG
SiC#38.PNG
  128   Friday, March 10, 2023, 07:21 Aaron Schmidt      ReadyTarget Material Batch - Ta

 Tantalum - Standard foils.

MTR PO: TR-2022-03028

Average foil thickness: 0.0013"

Attachment 1: Ta_2023_-_01.pdf
Ta_2023_-_01.pdf Ta_2023_-_01.pdf
  40   Monday, March 31, 2014, 15:02 John WongTiC#4HP-SIS  38817-839956-10SpentTarget Description

 Monday, March 31, 2014, 15:00

Target consists of 360 discs of TiC + graphite foils. 

Total length = 11.7cm 

Total green mass = 40.945g

(see attachment for more details) 


 

 

Attachment 1: TiC#4_description.JPG
TiC#4_description.JPG
  126   Monday, February 06, 2023, 10:02 Darwin Ortiz RosalesC#6   45220-6 ReadyTarget C#6 Description
Attachment 1: C#6_Description.png
C#6_Description.png
  125   Wednesday, December 14, 2022, 10:28 Darwin Ortiz RosalesC#5   44691-13 ReadyTarget C#5 Description

Graphite target

Attachment 1: C#5_Description.png
C#5_Description.png
  122   Thursday, September 22, 2022, 13:18 Darwin Ortiz RosalesC#4LP-SIS  44691-3 ReadyTarget C#4 Description

Thursday, September 22, 2022, 13:17

Attachment 1: C#4_Target_Description.png
C#4_Target_Description.png
  101   Tuesday, September 29, 2020, 11:50 Marla CervantesC#2LP-SISITWTM244139-9 In progressTarget C#2 Description

 Tuesday, September 29, 2020, 11:49

See attached picture for description 

Attachment 1: C2-Description.JPG
C2-Description.JPG
  100   Thursday, June 04, 2020, 15:00 Marla CervantesC#1LP-SIS  43044-8 In progressTarget C#1 Description

 Thursday, June 04, 2020, 15:00

See attached picture for description 

Attachment 1: C1-Description.PNG
C1-Description.PNG
  111   Tuesday, September 21, 2021, 21:08 Darwin Ortiz RosalesC#3LP-SIS  44691-7 ReadyTarget C #3 Description

 Tuesday, September 21, 2021, 21:09

See attached file for target description.

Attachment 1: C#3_Target_description.png
C#3_Target_description.png
  147   Monday, October 07, 2024, 13:16 Aaron SchmidtTa#68HP-SISITETM245447-2645235-16ReadyTa#68 Target Description

 Ta#68 HP-SIS target description: 

Total Ta foils = 470 [6x20 packs + 350 single discs]

Foil Thickness = 0.0254mm (0.0010") avg Measured. 

Target material batch: PO# TR-2023-06149

Target density = 14.204 g/cm3

Target length = 3.50 cm

Total Mass = 49.7146 g [Incl foils + Ta wire on 6 packs]

Total mass w/ Target oven =  1483g (w/ end caps)

Discs in target are arranged as follows: 1pack / 75 singles / 1pack / 100 singles / 2packs / 100 singles / 1pack / 75 singles / 1pack

Dimpling direction on foils/ Packs.                                                               --> Center <--

End caps installed (Expanded). No Ta foil heat shield added

Attachment 1: ITE-TM2-Ta#68-HP-SIS_Target_Loading_Data.pdf
ITE-TM2-Ta#68-HP-SIS_Target_Loading_Data.pdf
ELOG V2.9.2-2455