Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 4 of 8  Not logged in ELOG logo
Entry  Monday, August 16, 2021, 11:02, John Wong, UCx#34, LP-SIS, ITW, TM2, 44691-5, 44378-1, Ready, Target description  UCx#34_target_description.PNGUCx_34_SEM_Density_Measurements.pdf

Monday, August 16, 2021, 11:01

See attachments for the target description and SEM images


 

Entry  Tuesday, July 30, 2019, 15:52, Darwin Ortiz Rosales, ZrC#8, LP-SIS, ITE, TM2, 43044-5, , Ready, Target description ZrC8.pngZrC_8_SEM.pdf

 

Tuesday, July 30, 2019, 15:50

See attachment for details


Thursday, August 01, 2019, 07:41

See attachment#2 for SEM - JW

 

 

 

Entry  Friday, May 26, 2023, 11:35, Darwin Ortiz Rosales, TiC#6, HP-SIS, , , 44692-10, , Ready, Target TiC #6 Description TiC_#6.png
 
Entry  Monday, May 01, 2023, 14:59, Darwin Ortiz Rosales, TiC #5, LP-FEBIAD, , , 44692-5, , Ready, Target TiC #5 Description TiC#5.png
 
Entry  Tuesday, August 16, 2022, 09:48, Darwin Ortiz Rosales, SiC#44, HP-FEBIAD, , , 37978-1, , Ready, Target SiC#44 Description 

Tuesday, August 16, 2022, 09:47

Entry  Monday, June 20, 2022, 10:35, Darwin Ortiz Rosales, SiC#43, HP-FEBIAD, , , 42464-1, , Ready, Target SiC#43 Description 

Monday, June 20, 2022, 10:33

Entry  Wednesday, May 25, 2022, 10:15, Darwin Ortiz Rosales, SiC#42, HP-FEBIAD, , , 44692-9, , Ready, Target SiC#42 Description Description-SiC#42.png

Wednesday, May 25, 2022, 10:15

Entry  Monday, September 13, 2021, 14:53, Darwin Ortiz Rosales, SiC#41, HP-SIS, , , 42218-7, , Ready, Target SiC#41 Description Screenshot_2021-09-13_144830.png

Monday, September 13, 2021, 14:52

Entry  Wednesday, April 15, 2020, 08:10, Darwin Ortiz Rosales, SiC#40, HP-SIS, , , 42218-8, , Ready, Target SiC#40 Description Annotation_2020-04-15_080836.png

Wednesday, April 15, 2020, 07:51

See attached picture for description 

Entry  Friday, November 29, 2019, 10:53, Darwin Ortiz Rosales, SiC#39, HP-FEBIAD, , TM2, 42464-3, , Ready, Target SiC#39 Description SiC#39_description.PNGSiC39_SEM.pdf

Friday, December 06, 2019, 15:34

Added SEM images (see attachment#2) - JW


 

Entry  Friday, October 11, 2019, 09:26, Darwin Ortiz Rosales, SiC#38, HP-FEBIAD, , TM2, 42464-4, , Ready, Target SiC#38 Description SiC#38.PNG

Friday, October 11, 2019, 09:25

See attached picture for description.

 

Entry  Friday, March 10, 2023, 07:21, Aaron Schmidt, , , , , , , Ready, Target Material Batch - Ta Ta_2023_-_01.pdf

 Tantalum - Standard foils.

MTR PO: TR-2022-03028

Average foil thickness: 0.0013"

Entry  Monday, March 31, 2014, 15:02, John Wong, TiC#4, HP-SIS, , , 38817-8, 39956-10, Spent, Target Description  TiC#4_description.JPG

 Monday, March 31, 2014, 15:00

Target consists of 360 discs of TiC + graphite foils. 

Total length = 11.7cm 

Total green mass = 40.945g

(see attachment for more details) 


 

 

Entry  Monday, February 06, 2023, 10:02, Darwin Ortiz Rosales, C#6, , , , 45220-6, , Ready, Target C#6 Description C#6_Description.png
 
Entry  Wednesday, December 14, 2022, 10:28, Darwin Ortiz Rosales, C#5, , , , 44691-13, , Ready, Target C#5 Description C#5_Description.png

Graphite target

Entry  Thursday, September 22, 2022, 13:18, Darwin Ortiz Rosales, C#4, LP-SIS, , , 44691-3, , Ready, Target C#4 Description C#4_Target_Description.png

Thursday, September 22, 2022, 13:17

Entry  Tuesday, September 29, 2020, 11:50, Marla Cervantes, C#2, LP-SIS, ITW, TM2, 44139-9, , In progress, Target C#2 Description  C2-Description.JPG

 Tuesday, September 29, 2020, 11:49

See attached picture for description 

Entry  Thursday, June 04, 2020, 15:00, Marla Cervantes, C#1, LP-SIS, , , 43044-8, , In progress, Target C#1 Description C1-Description.PNG

 Thursday, June 04, 2020, 15:00

See attached picture for description 

Entry  Tuesday, September 21, 2021, 21:08, Darwin Ortiz Rosales, C#3, LP-SIS, , , 44691-7, , Ready, Target C #3 Description C#3_Target_description.png

 Tuesday, September 21, 2021, 21:09

See attached file for target description.

Entry  Monday, October 07, 2024, 13:16, Aaron Schmidt, Ta#68, HP-SIS, ITE, TM2, 45447-26, 45235-16, Ready, Ta#68 Target Description ITE-TM2-Ta#68-HP-SIS_Target_Loading_Data.pdf

 Ta#68 HP-SIS target description: 

Total Ta foils = 470 [6x20 packs + 350 single discs]

Foil Thickness = 0.0254mm (0.0010") avg Measured. 

Target material batch: PO# TR-2023-06149

Target density = 14.204 g/cm3

Target length = 3.50 cm

Total Mass = 49.7146 g [Incl foils + Ta wire on 6 packs]

Total mass w/ Target oven =  1483g (w/ end caps)

Discs in target are arranged as follows: 1pack / 75 singles / 1pack / 100 singles / 2packs / 100 singles / 1pack / 75 singles / 1pack

Dimpling direction on foils/ Packs.                                                               --> Center <--

End caps installed (Expanded). No Ta foil heat shield added

ELOG V2.9.2-2455