ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
14
|
Tuesday, September 06, 2011, 13:19 |
John Wong | TaC#1 | LP-SIS | ITE | TM1 | 38634-6 | | Spent | Target is done |
Tuesday, September 06, 2011, 13:14:
Average mass = 0.206g
Average Thickness = 0.0189 cm
Area of D-shaped disc = 2.21 cm2
D-shape discs diameter = 18.5mm (14.5mm cut-out length)
Oven ID, L= 18.22mm, R = 18.20mm
Density = 4.9266 g/cm3
% Yield Density = 47.20%
Attachment#1 - TaC density measurements.
Loaded target with 125 discs --> 9.6g Ta/cm2
Total discs mass = 30.41g
Total length = 4.5 cm
Thursday, September 15, 2011, 10:45
Na & Li were added.
Re foil inserted.
No Ta-heat shields required.
Friday, September 30, 2011, 14:10
After the test-stand, 10uL of Na and Li were added yesterday.
Target is now ready, and will be moved into the hotcell next week.
Wednesday, November 16, 2011, 15:51
After the target was finished and transferred into the hotcell, it was found that the target broke apart from the center block. This might have happened during the end of the target cooldown. See link for more details:
http://documents.triumf.ca/docushare/dsweb/View/Collection-7438
|
Attachment 1: TaC_density_measurements.xls
|
10
|
Wednesday, July 06, 2011, 14:13 |
John Wong | Ta#40 | HP-SIS | | | 38295-4 | | Spent | Target description |
Details about Ta Hp surface, w.o#38295-4 (spare):
This target was built as a spare.
Note: Left side target arm replaced, Nov 18, 2010. Weld prep on centre block misaligned. (Marik has more details about this).
Packs of Ta foils were prepared by JW.
Target was filled with 400 of 0.025mm foils (25 foils/pk) in 4.0cm length.
Total Mass of 16 packs of Ta foils + Ta wires = 42.70g.
See attachment#1 for the measurement.
Friday, April 19, 2013, 09:44
Target was tested at the Teststand. Result Good.
Ready for use.
|
109
|
Monday, August 16, 2021, 11:02 |
John Wong | UCx#34 | LP-SIS | ITW | TM2 | 44691-5 | 44378-1 | Ready | Target description |
Monday, August 16, 2021, 11:01
See attachments for the target description and SEM images
|
Attachment 1: UCx#34_target_description.PNG
|
|
Attachment 2: UCx_34_SEM_Density_Measurements.pdf
|
|
91
|
Tuesday, July 30, 2019, 15:52 |
Darwin Ortiz Rosales | ZrC#8 | LP-SIS | ITE | TM2 | 43044-5 | | Ready | Target description |
Tuesday, July 30, 2019, 15:50
See attachment for details
Thursday, August 01, 2019, 07:41
See attachment#2 for SEM - JW
|
Attachment 1: ZrC8.png
|
|
Attachment 2: ZrC_8_SEM.pdf
|
|
130
|
Friday, May 26, 2023, 11:35 |
Darwin Ortiz Rosales | TiC#6 | HP-SIS | | | 44692-10 | | Ready | Target TiC #6 Description |
|
Attachment 1: TiC_#6.png
|
|
129
|
Monday, May 01, 2023, 14:59 |
Darwin Ortiz Rosales | TiC #5 | LP-FEBIAD | | | 44692-5 | | Ready | Target TiC #5 Description |
|
Attachment 1: TiC#5.png
|
|
121
|
Tuesday, August 16, 2022, 09:48 |
Darwin Ortiz Rosales | SiC#44 | HP-FEBIAD | | | 37978-1 | | Ready | Target SiC#44 Description |
Tuesday, August 16, 2022, 09:47

|
117
|
Monday, June 20, 2022, 10:35 |
Darwin Ortiz Rosales | SiC#43 | HP-FEBIAD | | | 42464-1 | | Ready | Target SiC#43 Description |
Monday, June 20, 2022, 10:33

|
115
|
Wednesday, May 25, 2022, 10:15 |
Darwin Ortiz Rosales | SiC#42 | HP-FEBIAD | | | 44692-9 | | Ready | Target SiC#42 Description |
Wednesday, May 25, 2022, 10:15

|
Attachment 1: Description-SiC#42.png
|
|
110
|
Monday, September 13, 2021, 14:53 |
Darwin Ortiz Rosales | SiC#41 | HP-SIS | | | 42218-7 | | Ready | Target SiC#41 Description |
Monday, September 13, 2021, 14:52

|
Attachment 1: Screenshot_2021-09-13_144830.png
|
|
99
|
Wednesday, April 15, 2020, 08:10 |
Darwin Ortiz Rosales | SiC#40 | HP-SIS | | | 42218-8 | | Ready | Target SiC#40 Description |
Wednesday, April 15, 2020, 07:51
See attached picture for description |
Attachment 1: Annotation_2020-04-15_080836.png
|
|
97
|
Friday, November 29, 2019, 10:53 |
Darwin Ortiz Rosales | SiC#39 | HP-FEBIAD | | TM2 | 42464-3 | | Ready | Target SiC#39 Description |
Friday, December 06, 2019, 15:34
Added SEM images (see attachment#2) - JW
|
Attachment 1: SiC#39_description.PNG
|
|
Attachment 2: SiC39_SEM.pdf
|
|
94
|
Friday, October 11, 2019, 09:26 |
Darwin Ortiz Rosales | SiC#38 | HP-FEBIAD | | TM2 | 42464-4 | | Ready | Target SiC#38 Description |
Friday, October 11, 2019, 09:25
See attached picture for description.
|
Attachment 1: SiC#38.PNG
|
|
128
|
Friday, March 10, 2023, 07:21 |
Aaron Schmidt | | | | | | | Ready | Target Material Batch - Ta |
Tantalum - Standard foils.
MTR PO: TR-2022-03028
Average foil thickness: 0.0013" |
Attachment 1: Ta_2023_-_01.pdf
|
|
40
|
Monday, March 31, 2014, 15:02 |
John Wong | TiC#4 | HP-SIS | | | 38817-8 | 39956-10 | Spent | Target Description |
Monday, March 31, 2014, 15:00
Target consists of 360 discs of TiC + graphite foils.
Total length = 11.7cm
Total green mass = 40.945g
(see attachment for more details)
|
Attachment 1: TiC#4_description.JPG
|
|
126
|
Monday, February 06, 2023, 10:02 |
Darwin Ortiz Rosales | Target Reassigned (VOID ENTRY) | | | | 45220-6 | | Ready | Target C#6 Description |
|
Attachment 1: C#6_Description.png
|
|
125
|
Wednesday, December 14, 2022, 10:28 |
Darwin Ortiz Rosales | Target reassigned (VOID ENTRY) | | | | 44691-13 | | Ready | Target C#5 Description |
Graphite target |
Attachment 1: C#5_Description.png
|
|
122
|
Thursday, September 22, 2022, 13:18 |
Darwin Ortiz Rosales | C#4 | LP-SIS | | | 44691-3 | | Ready | Target C#4 Description |
Thursday, September 22, 2022, 13:17 |
Attachment 1: C#4_Target_Description.png
|
|
101
|
Tuesday, September 29, 2020, 11:50 |
Marla Cervantes | C#2 | LP-SIS | ITW | TM2 | 44139-9 | | In progress | Target C#2 Description |
Tuesday, September 29, 2020, 11:49
See attached picture for description |
Attachment 1: C2-Description.JPG
|
|
100
|
Thursday, June 04, 2020, 15:00 |
Marla Cervantes | C#1 | LP-SIS | | | 43044-8 | | In progress | Target C#1 Description |
Thursday, June 04, 2020, 15:00
See attached picture for description |
Attachment 1: C1-Description.PNG
|
|