Entry  Tuesday, May 16, 2017, 13:18, Laura Lambert, UCx#20, LP-IG-LIS, ITE, TM4, 42218-1, , Ready, UCx#20 Target Description target_description.JPG

 Tuesday, May 16, 2017, 13:13

Attached please find the UCx#20 target description.


 

Entry  Tuesday, August 09, 2011, 14:31, John Wong, UCx#2, LP-SIS, ITW, TM1, 38634-8, 38633-5, Spent, UCx#2 run is finished. broke_screwhead.jpgUCx#2.jpg

UCx#2 Spec:

Target wrapped with 3 Ta-heat shields

Target length = 11.2cm

Total UC2/C foils = 245 discs

Total U/cm2 = 15.27g

Standard salts = 10uL Na, 10uL Li


Tuesday, August 09, 2011, 14:27: 

Target came out from the glovebox and transported to the cold lab for assembly.  During the assembly, one of the screw-heads for the heat-shield broke (see attachment#1: broken_screwhead). 

The target was leak checked and fine. 

Target is going back to the glovebox to be kept under Ar until RH is ready (see attachment #2: UCx#2).


 Tuesday, October 04, 2011, 10:21

UCx#2 run was finished last week.  

Target was moved from ITW to south hot cell, and stored in a bucket under argon feed. 


 

Entry  Tuesday, March 07, 2017, 10:00, Laura Lambert, UCx#19, LP-SIS, , TM4, 42218-12, , Ready, UCx#19 Target Description UCx#19_description.jpg

 Tuesday, March 07, 2017, 09:54

Attached please find the UCx#19 target description.


 

Entry  Friday, October 21, 2016, 13:47, Laura Lambert, UCx#18, LP-SIS, , , 41790-6, , Ready, UCx#18 Target Description UCx#18_description.jpg

 Friday, October 21, 2016, 13:46

Attached please find the UCx#18 target description.


 

Entry  Tuesday, August 02, 2016, 15:28, Laura Lambert, UCx#17, LP-SIS, , , 41790-3, , Ready, UCx#17 Target Description UCx#17_description.jpg

 Tuesday, August 02, 2016, 15:27

Attached please find the UCx#17 target description.


 

Entry  Wednesday, June 08, 2016, 15:55, Laura Lambert, UCx#16, LP-IG-LIS, , , 40860-2, , Ready, UCx#16 Target Description Target_Description.JPG

 Wednesday, June 08, 2016, 15:52

Attached please find the UCx#16 target description.


 

Entry  Friday, March 04, 2016, 14:57, Laura Lambert, UCx#15, LP-SIS, ITW, , 41077-1, , Ready, UCx#15 Target Description UCx_15_description.jpg

 Friday, March 04, 2016, 14:56

Attached please find the UCx#15 target description.

Note: This is the second UCx target using the new LP-SIS small center block design.


 

Entry  Monday, October 26, 2015, 16:33, Laura Lambert, UCx#14, LP-SIS, , , 41077-5, , Ready, UCx#14 Target Description Capture.JPG

 Monday, October 26, 2015, 16:23

Attached please find the UCx#14 target description.

Note: This is the first UCx target using the new LP-SIS small center block design.


 

 

 

 

Entry  Friday, July 10, 2015, 11:23, John Wong, UCx#13, LP-IG-LIS, ITE, TM4, 40860-1, , Ready, UCx#13 Target description UCx_13_target_description.PNG

 Friday, July 10, 2015, 11:15

Attached please find the UCx#13 target description.   

Note:  Target container was coated/sintered with TaC twice.  Would like to see if this will improve the life-span of the target.  


 

Entry  Friday, June 17, 2011, 11:58, John Wong, UCx (flakes), LP-SIS, , , , , Problems/Solutions, Making UC2 flakes (stock# 2011_A & _B) 8x

Fri Jun 17 10:28:47 2011

First batch of UO2/C mixture of carbonization (Stock# 2011_A):   

UO2 used = 50.120g (left overs + container = 411.23g)

C(grv) used = 10.653g (or 21.25% w/w)

Mass of organics = 4.842g (or 9.66% w/w) 

Mass of dried cast = 47.420g 

Waste collected in jar = 18.195g (including UO2, C and Org) 

Waste accountable for UO2 = 12.57g

The carbonization process started from May 26 to June 4 (9 days).  

See attachment #1 and #2 for the striptools during the UO2/C carbonization

Total Mass UC2 flakes = 35.310g 


 Fri Jun 17 11:56:15 2011

Attempted to make the second batch of UO2/C mixture of carbonization on June 13, but it failed.  The milling jar gasket seal partially came out during the high speed milling.  As a result, the UO2/C mixture squirted out and contaminated the planetary mill (See attachment #3 & #4).  RPG and all other groups were informed.  The planetary mill and the lab were properly cleaned up (see attachment #5), no activities were found after the cleaning.  Attachments #6, #7, #8 are some of the discussion about the UO2 spill.  

All the UO2 taken out from the container (50.23g) is accountable for waste.  

 


 June 28, 2011 - Re-making 2nd batch of UO2/C mixture was successful.  

Stock#2011_B:

UO2 used = 50.29g

C(grv) used = 10.0g 

Mass of Organics = 4.84g 

Mass of Dried green = 71.96g (the cast was let dry over night <24hrs due to time restriction.  It might not be completely dried as a result of such heavy mass remained.  However, the UO2 waste was very minimum, <5.0g) 

Total Mass UC2 flakes = 56.853g 

 


 

 

 

 

 

Entry  Friday, April 17, 2015, 16:00, Laura Lambert, UCx # 12, LP-SIS, ITW, TM1, 41177-2, , Ready, UCx#12 Target Description UCx_12_target_description.PNG

 Thursday, April 16, 2015, 14:07

See attachment for target description

Entry  Thursday, November 06, 2014, 13:35, Laura Lambert, UCx # 11, LP-SIS, ITE, TM4, 40282-5, , Ready, UCx#11 Target Description UCx_11_target_description.PNG

 Thursday, November 06, 2014, 13:29

See attachment for target description


 

Entry  Tuesday, July 15, 2014, 11:01, Laura Lambert, UCx # 10, LP-SIS, ITE, TM4, 39165-10, , Ready, UCx#10 Target Description UCx_10_target_description.PNG

Tuesday, July 15, 2014, 10:58

See attachment for target description 

Entry  Tuesday, September 10, 2024, 09:53, Darwin Ortiz Rosales, TiC#9, HP-SIS, , , 45447-29, 45235-19, Ready, TiC#9_Description TiC#9.png
 
Entry  Tuesday, September 03, 2024, 16:11, Darwin Ortiz Rosales, TiC#8, HP-FEBIAD, , , 45447-2, , Ready, TiC#8_Description TiC#8_(2).png

This was back-up target

Entry  Friday, June 14, 2024, 14:16, Darwin Ortiz Rosales, TiC#7, HP-FEBIAD, , , 45447-5, 45235-15, Ready, TiC#7_Description TiC#7.png

Please note that this target comes in a Graphite cartridge.

Entry  Friday, May 26, 2023, 11:35, Darwin Ortiz Rosales, TiC#6, HP-SIS, , , 44692-10, , Ready, Target TiC #6 Description TiC_#6.png
 
Entry  Monday, March 31, 2014, 15:02, John Wong, TiC#4, HP-SIS, , , 38817-8, 39956-10, Spent, Target Description  TiC#4_description.JPG

 Monday, March 31, 2014, 15:00

Target consists of 360 discs of TiC + graphite foils. 

Total length = 11.7cm 

Total green mass = 40.945g

(see attachment for more details) 


 

 

Entry  Monday, May 01, 2023, 14:59, Darwin Ortiz Rosales, TiC #5, LP-FEBIAD, , , 44692-5, , Ready, Target TiC #5 Description TiC#5.png
 
Entry  Monday, August 18, 2014, 14:39, Laura Lambert, ThO2 #1, LP-SIS, , , , , , ThO2 #1 Target Description ThO2#1_target_description.JPG

Monday, August 18, 2014, 14:53

See attachment for target description


 