73
|
Tuesday, May 16, 2017, 13:18 |
Laura Lambert | UCx#20 | LP-IG-LIS | ITE | TM4 | 42218-1 | | Ready | UCx#20 Target Description |
Tuesday, May 16, 2017, 13:13
Attached please find the UCx#20 target description.
|
Attachment 1: target_description.JPG
|
|
13
|
Tuesday, August 09, 2011, 14:31 |
John Wong | UCx#2 | LP-SIS | ITW | TM1 | 38634-8 | 38633-5 | Spent | UCx#2 run is finished. |
UCx#2 Spec:
Target wrapped with 3 Ta-heat shields
Target length = 11.2cm
Total UC2/C foils = 245 discs
Total U/cm2 = 15.27g
Standard salts = 10uL Na, 10uL Li
Tuesday, August 09, 2011, 14:27:
Target came out from the glovebox and transported to the cold lab for assembly. During the assembly, one of the screw-heads for the heat-shield broke (see attachment#1: broken_screwhead).
The target was leak checked and fine.
Target is going back to the glovebox to be kept under Ar until RH is ready (see attachment #2: UCx#2).
Tuesday, October 04, 2011, 10:21
UCx#2 run was finished last week.
Target was moved from ITW to south hot cell, and stored in a bucket under argon feed.
|
Attachment 1: broke_screwhead.jpg
|
|
Attachment 2: UCx#2.jpg
|
|
71
|
Tuesday, March 07, 2017, 10:00 |
Laura Lambert | UCx#19 | LP-SIS | | TM4 | 42218-12 | | Ready | UCx#19 Target Description |
Tuesday, March 07, 2017, 09:54
Attached please find the UCx#19 target description.
|
Attachment 1: UCx#19_description.jpg
|
|
70
|
Friday, October 21, 2016, 13:47 |
Laura Lambert | UCx#18 | LP-SIS | | | 41790-6 | | Ready | UCx#18 Target Description |
Friday, October 21, 2016, 13:46
Attached please find the UCx#18 target description.
|
Attachment 1: UCx#18_description.jpg
|
|
65
|
Tuesday, August 02, 2016, 15:28 |
Laura Lambert | UCx#17 | LP-SIS | | | 41790-3 | | Ready | UCx#17 Target Description |
Tuesday, August 02, 2016, 15:27
Attached please find the UCx#17 target description.
|
Attachment 1: UCx#17_description.jpg
|
|
63
|
Wednesday, June 08, 2016, 15:55 |
Laura Lambert | UCx#16 | LP-IG-LIS | | | 40860-2 | | Ready | UCx#16 Target Description |
Wednesday, June 08, 2016, 15:52
Attached please find the UCx#16 target description.
|
Attachment 1: Target_Description.JPG
|
|
60
|
Friday, March 04, 2016, 14:57 |
Laura Lambert | UCx#15 | LP-SIS | ITW | | 41077-1 | | Ready | UCx#15 Target Description |
Friday, March 04, 2016, 14:56
Attached please find the UCx#15 target description.
Note: This is the second UCx target using the new LP-SIS small center block design.
|
Attachment 1: UCx_15_description.jpg
|
|
59
|
Monday, October 26, 2015, 16:33 |
Laura Lambert | UCx#14 | LP-SIS | | | 41077-5 | | Ready | UCx#14 Target Description |
Monday, October 26, 2015, 16:23
Attached please find the UCx#14 target description.
Note: This is the first UCx target using the new LP-SIS small center block design.
|
Attachment 1: Capture.JPG
|
|
55
|
Friday, July 10, 2015, 11:23 |
John Wong | UCx#13 | LP-IG-LIS | ITE | TM4 | 40860-1 | | Ready | UCx#13 Target description |
Friday, July 10, 2015, 11:15
Attached please find the UCx#13 target description.
Note: Target container was coated/sintered with TaC twice. Would like to see if this will improve the life-span of the target.
|
Attachment 1: UCx_13_target_description.PNG
|
|
9
|
Friday, June 17, 2011, 11:58 |
John Wong | UCx (flakes) | LP-SIS | | | | | Problems/Solutions | Making UC2 flakes (stock# 2011_A & _B) |
Fri Jun 17 10:28:47 2011
First batch of UO2/C mixture of carbonization (Stock# 2011_A):
UO2 used = 50.120g (left overs + container = 411.23g)
C(grv) used = 10.653g (or 21.25% w/w)
Mass of organics = 4.842g (or 9.66% w/w)
Mass of dried cast = 47.420g
Waste collected in jar = 18.195g (including UO2, C and Org)
Waste accountable for UO2 = 12.57g
The carbonization process started from May 26 to June 4 (9 days).
See attachment #1 and #2 for the striptools during the UO2/C carbonization
Total Mass UC2 flakes = 35.310g
Fri Jun 17 11:56:15 2011
Attempted to make the second batch of UO2/C mixture of carbonization on June 13, but it failed. The milling jar gasket seal partially came out during the high speed milling. As a result, the UO2/C mixture squirted out and contaminated the planetary mill (See attachment #3 & #4). RPG and all other groups were informed. The planetary mill and the lab were properly cleaned up (see attachment #5), no activities were found after the cleaning. Attachments #6, #7, #8 are some of the discussion about the UO2 spill.
All the UO2 taken out from the container (50.23g) is accountable for waste.
June 28, 2011 - Re-making 2nd batch of UO2/C mixture was successful.
Stock#2011_B:
UO2 used = 50.29g
C(grv) used = 10.0g
Mass of Organics = 4.84g
Mass of Dried green = 71.96g (the cast was let dry over night <24hrs due to time restriction. It might not be completely dried as a result of such heavy mass remained. However, the UO2 waste was very minimum, <5.0g)
Total Mass UC2 flakes = 56.853g
|
Attachment 1: UO2_C_IG1_CG2_2011_A.jpg
|
|
Attachment 2: UO2_C_TGHT_IG1_2011_A.jpg
|
|
Attachment 3: UO2_mill_spill_01.png
|
|
Attachment 4: UO2_mill_spill_02.png
|
|
Attachment 5: UO2_spill_cleanup.png
|
|
Attachment 6: UO2_spill_discussion_01.png
|
|
Attachment 7: UO2_spill_discussion_02.png
|
|
Attachment 8: UO2_spill_discussion_03.png
|
|
50
|
Friday, April 17, 2015, 16:00 |
Laura Lambert | UCx # 12 | LP-SIS | ITW | TM1 | 41177-2 | | Ready | UCx#12 Target Description |
Thursday, April 16, 2015, 14:07
See attachment for target description |
Attachment 1: UCx_12_target_description.PNG
|
|
48
|
Thursday, November 06, 2014, 13:35 |
Laura Lambert | UCx # 11 | LP-SIS | ITE | TM4 | 40282-5 | | Ready | UCx#11 Target Description |
Thursday, November 06, 2014, 13:29
See attachment for target description
|
Attachment 1: UCx_11_target_description.PNG
|
|
44
|
Tuesday, July 15, 2014, 11:01 |
Laura Lambert | UCx # 10 | LP-SIS | ITE | TM4 | 39165-10 | | Ready | UCx#10 Target Description |
Tuesday, July 15, 2014, 10:58
See attachment for target description |
Attachment 1: UCx_10_target_description.PNG
|
|
145
|
Tuesday, September 10, 2024, 09:53 |
Darwin Ortiz Rosales | TiC#9 | HP-SIS | | | 45447-29 | 45235-19 | Ready | TiC#9_Description |
|
Attachment 1: TiC#9.png
|
|
144
|
Tuesday, September 03, 2024, 16:11 |
Darwin Ortiz Rosales | TiC#8 | HP-FEBIAD | | | 45447-2 | | Ready | TiC#8_Description |
This was back-up target |
Attachment 1: TiC#8_(2).png
|
|
142
|
Friday, June 14, 2024, 14:16 |
Darwin Ortiz Rosales | TiC#7 | HP-FEBIAD | | | 45447-5 | 45235-15 | Ready | TiC#7_Description |
Please note that this target comes in a Graphite cartridge. |
Attachment 1: TiC#7.png
|
|
130
|
Friday, May 26, 2023, 11:35 |
Darwin Ortiz Rosales | TiC#6 | HP-SIS | | | 44692-10 | | Ready | Target TiC #6 Description |
|
Attachment 1: TiC_#6.png
|
|
40
|
Monday, March 31, 2014, 15:02 |
John Wong | TiC#4 | HP-SIS | | | 38817-8 | 39956-10 | Spent | Target Description |
Monday, March 31, 2014, 15:00
Target consists of 360 discs of TiC + graphite foils.
Total length = 11.7cm
Total green mass = 40.945g
(see attachment for more details)
|
Attachment 1: TiC#4_description.JPG
|
|
129
|
Monday, May 01, 2023, 14:59 |
Darwin Ortiz Rosales | TiC #5 | LP-FEBIAD | | | 44692-5 | | Ready | Target TiC #5 Description |
|
Attachment 1: TiC#5.png
|
|
46
|
Monday, August 18, 2014, 14:39 |
Laura Lambert | ThO2 #1 | LP-SIS | | | | | | ThO2 #1 Target Description |
Monday, August 18, 2014, 14:53
See attachment for target description
|
Attachment 1: ThO2#1_target_description.JPG
|
|