Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 3 of 8  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target/No.#down Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject
  73   Tuesday, May 16, 2017, 13:18 Laura LambertUCx#20LP-IG-LISITETM442218-1 ReadyUCx#20 Target Description

 Tuesday, May 16, 2017, 13:13

Attached please find the UCx#20 target description.


 

Attachment 1: target_description.JPG
target_description.JPG
  13   Tuesday, August 09, 2011, 14:31 John WongUCx#2LP-SISITWTM138634-838633-5SpentUCx#2 run is finished.

UCx#2 Spec:

Target wrapped with 3 Ta-heat shields

Target length = 11.2cm

Total UC2/C foils = 245 discs

Total U/cm2 = 15.27g

Standard salts = 10uL Na, 10uL Li


Tuesday, August 09, 2011, 14:27: 

Target came out from the glovebox and transported to the cold lab for assembly.  During the assembly, one of the screw-heads for the heat-shield broke (see attachment#1: broken_screwhead). 

The target was leak checked and fine. 

Target is going back to the glovebox to be kept under Ar until RH is ready (see attachment #2: UCx#2).


 Tuesday, October 04, 2011, 10:21

UCx#2 run was finished last week.  

Target was moved from ITW to south hot cell, and stored in a bucket under argon feed. 


 

Attachment 1: broke_screwhead.jpg
broke_screwhead.jpg
Attachment 2: UCx#2.jpg
UCx#2.jpg
  71   Tuesday, March 07, 2017, 10:00 Laura LambertUCx#19LP-SIS TM442218-12 ReadyUCx#19 Target Description

 Tuesday, March 07, 2017, 09:54

Attached please find the UCx#19 target description.


 

Attachment 1: UCx#19_description.jpg
UCx#19_description.jpg
  70   Friday, October 21, 2016, 13:47 Laura LambertUCx#18LP-SIS  41790-6 ReadyUCx#18 Target Description

 Friday, October 21, 2016, 13:46

Attached please find the UCx#18 target description.


 

Attachment 1: UCx#18_description.jpg
UCx#18_description.jpg
  65   Tuesday, August 02, 2016, 15:28 Laura LambertUCx#17LP-SIS  41790-3 ReadyUCx#17 Target Description

 Tuesday, August 02, 2016, 15:27

Attached please find the UCx#17 target description.


 

Attachment 1: UCx#17_description.jpg
UCx#17_description.jpg
  63   Wednesday, June 08, 2016, 15:55 Laura LambertUCx#16LP-IG-LIS  40860-2 ReadyUCx#16 Target Description

 Wednesday, June 08, 2016, 15:52

Attached please find the UCx#16 target description.


 

Attachment 1: Target_Description.JPG
Target_Description.JPG
  60   Friday, March 04, 2016, 14:57 Laura LambertUCx#15LP-SISITW 41077-1 ReadyUCx#15 Target Description

 Friday, March 04, 2016, 14:56

Attached please find the UCx#15 target description.

Note: This is the second UCx target using the new LP-SIS small center block design.


 

Attachment 1: UCx_15_description.jpg
UCx_15_description.jpg
  59   Monday, October 26, 2015, 16:33 Laura LambertUCx#14LP-SIS  41077-5 ReadyUCx#14 Target Description

 Monday, October 26, 2015, 16:23

Attached please find the UCx#14 target description.

Note: This is the first UCx target using the new LP-SIS small center block design.


 

 

 

 

Attachment 1: Capture.JPG
Capture.JPG
  55   Friday, July 10, 2015, 11:23 John WongUCx#13LP-IG-LISITETM440860-1 ReadyUCx#13 Target description

 Friday, July 10, 2015, 11:15

Attached please find the UCx#13 target description.   

Note:  Target container was coated/sintered with TaC twice.  Would like to see if this will improve the life-span of the target.  


 

Attachment 1: UCx_13_target_description.PNG
UCx_13_target_description.PNG
  9   Friday, June 17, 2011, 11:58 John WongUCx (flakes)LP-SIS    Problems/SolutionsMaking UC2 flakes (stock# 2011_A & _B)

Fri Jun 17 10:28:47 2011

First batch of UO2/C mixture of carbonization (Stock# 2011_A):   

UO2 used = 50.120g (left overs + container = 411.23g)

C(grv) used = 10.653g (or 21.25% w/w)

Mass of organics = 4.842g (or 9.66% w/w) 

Mass of dried cast = 47.420g 

Waste collected in jar = 18.195g (including UO2, C and Org) 

Waste accountable for UO2 = 12.57g

The carbonization process started from May 26 to June 4 (9 days).  

See attachment #1 and #2 for the striptools during the UO2/C carbonization

Total Mass UC2 flakes = 35.310g 


 Fri Jun 17 11:56:15 2011

Attempted to make the second batch of UO2/C mixture of carbonization on June 13, but it failed.  The milling jar gasket seal partially came out during the high speed milling.  As a result, the UO2/C mixture squirted out and contaminated the planetary mill (See attachment #3 & #4).  RPG and all other groups were informed.  The planetary mill and the lab were properly cleaned up (see attachment #5), no activities were found after the cleaning.  Attachments #6, #7, #8 are some of the discussion about the UO2 spill.  

All the UO2 taken out from the container (50.23g) is accountable for waste.  

 


 June 28, 2011 - Re-making 2nd batch of UO2/C mixture was successful.  

Stock#2011_B:

UO2 used = 50.29g

C(grv) used = 10.0g 

Mass of Organics = 4.84g 

Mass of Dried green = 71.96g (the cast was let dry over night <24hrs due to time restriction.  It might not be completely dried as a result of such heavy mass remained.  However, the UO2 waste was very minimum, <5.0g) 

Total Mass UC2 flakes = 56.853g 

 


 

 

 

 

 

Attachment 1: UO2_C_IG1_CG2_2011_A.jpg
UO2_C_IG1_CG2_2011_A.jpg
Attachment 2: UO2_C_TGHT_IG1_2011_A.jpg
UO2_C_TGHT_IG1_2011_A.jpg
Attachment 3: UO2_mill_spill_01.png
UO2_mill_spill_01.png
Attachment 4: UO2_mill_spill_02.png
UO2_mill_spill_02.png
Attachment 5: UO2_spill_cleanup.png
UO2_spill_cleanup.png
Attachment 6: UO2_spill_discussion_01.png
UO2_spill_discussion_01.png
Attachment 7: UO2_spill_discussion_02.png
UO2_spill_discussion_02.png
Attachment 8: UO2_spill_discussion_03.png
UO2_spill_discussion_03.png
  50   Friday, April 17, 2015, 16:00 Laura LambertUCx # 12LP-SISITWTM141177-2 ReadyUCx#12 Target Description

 Thursday, April 16, 2015, 14:07

See attachment for target description

Attachment 1: UCx_12_target_description.PNG
UCx_12_target_description.PNG
  48   Thursday, November 06, 2014, 13:35 Laura LambertUCx # 11LP-SISITETM440282-5 ReadyUCx#11 Target Description

 Thursday, November 06, 2014, 13:29

See attachment for target description


 

Attachment 1: UCx_11_target_description.PNG
UCx_11_target_description.PNG
  44   Tuesday, July 15, 2014, 11:01 Laura LambertUCx # 10LP-SISITETM439165-10 ReadyUCx#10 Target Description

Tuesday, July 15, 2014, 10:58

See attachment for target description 

Attachment 1: UCx_10_target_description.PNG
UCx_10_target_description.PNG
  145   Tuesday, September 10, 2024, 09:53 Darwin Ortiz RosalesTiC#9HP-SIS  45447-2945235-19ReadyTiC#9_Description
Attachment 1: TiC#9.png
TiC#9.png
  144   Tuesday, September 03, 2024, 16:11 Darwin Ortiz RosalesTiC#8HP-FEBIAD  45447-2 ReadyTiC#8_Description

This was back-up target

Attachment 1: TiC#8_(2).png
TiC#8_(2).png
  142   Friday, June 14, 2024, 14:16 Darwin Ortiz RosalesTiC#7HP-FEBIAD  45447-545235-15ReadyTiC#7_Description

Please note that this target comes in a Graphite cartridge.

Attachment 1: TiC#7.png
TiC#7.png
  130   Friday, May 26, 2023, 11:35 Darwin Ortiz RosalesTiC#6HP-SIS  44692-10 ReadyTarget TiC #6 Description
Attachment 1: TiC_#6.png
TiC_#6.png
  40   Monday, March 31, 2014, 15:02 John WongTiC#4HP-SIS  38817-839956-10SpentTarget Description

 Monday, March 31, 2014, 15:00

Target consists of 360 discs of TiC + graphite foils. 

Total length = 11.7cm 

Total green mass = 40.945g

(see attachment for more details) 


 

 

Attachment 1: TiC#4_description.JPG
TiC#4_description.JPG
  129   Monday, May 01, 2023, 14:59 Darwin Ortiz RosalesTiC #5LP-FEBIAD  44692-5 ReadyTarget TiC #5 Description
Attachment 1: TiC#5.png
TiC#5.png
  46   Monday, August 18, 2014, 14:39 Laura LambertThO2 #1LP-SIS     ThO2 #1 Target Description

Monday, August 18, 2014, 14:53

See attachment for target description


 

Attachment 1: ThO2#1_target_description.JPG
ThO2#1_target_description.JPG
ELOG V2.9.2-2455