Message ID: 13     Entry time: Tuesday, August 09, 2011, 14:31
Author: John Wong 
Target/No.#: UCx#2 
Source: LP-SIS 
Station: ITW 
Module: TM1 
Target Oven W.O#: 38634-8 
Heat Shield W.O#: 38633-5 
Status: Spent 
Subject: UCx#2 run is finished. 

UCx#2 Spec:

Target wrapped with 3 Ta-heat shields

Target length = 11.2cm

Total UC2/C foils = 245 discs

Total U/cm2 = 15.27g

Standard salts = 10uL Na, 10uL Li


Tuesday, August 09, 2011, 14:27: 

Target came out from the glovebox and transported to the cold lab for assembly.  During the assembly, one of the screw-heads for the heat-shield broke (see attachment#1: broken_screwhead). 

The target was leak checked and fine. 

Target is going back to the glovebox to be kept under Ar until RH is ready (see attachment #2: UCx#2).


 Tuesday, October 04, 2011, 10:21

UCx#2 run was finished last week.  

Target was moved from ITW to south hot cell, and stored in a bucket under argon feed. 


 

Attachment 1: broke_screwhead.jpg  613 kB  Uploaded Tuesday, August 09, 2011, 17:45  | Show | Show all
Attachment 2: UCx#2.jpg  1.500 MB  Uploaded Tuesday, August 09, 2011, 17:47  | Show | Show all