  219   Tuesday, April 11, 2017, 17:02 Isaac EarleMaintenanceTarget 2CoolingT2 Cooling System MRO The following work has been completed
on the T2 cooling package:
- T2 system drained to South TNF
  
  347   Tuesday, May 07, 2024, 13:21 Albert KongRepairTarget 2CoolingT2 Cooling System Expansion Tank Ultrasonic Level Sensor RepairAt ~8am on May 06, the expansion tank level
sensor for the T2 cooling system suddenly
became noisy. 
 T2_Level_EPICS_Readout.pdfT2_expansion_tank_sensor_noise_issue_-_4_hr_after_fix.PNG 
  70   Monday, January 21, 2013, 16:18 Isaac EarleStandard OperationTarget 2TargetT2 Cooling Package Water ReleasedThe T2 cooling package water was drained
to the BL1A active sump, refilled, cycled,
and drained again.  Samples of T2 cooling
  
  88   Wednesday, September 11, 2013, 16:13 Isaac EarleRepairTarget 2CoolingT2 Cooling Package Water Leak Repair The T2 cooling package was uncovered
this morning and a leak was found coming
from the Swagelok ball valve on the 3/4"
  
  137   Friday, January 23, 2015, 13:28 Isaac EarleRepairTarget 2CoolingT2 Cooling Package Thermistor DefeatsBoth defeats applied to T2 cooling package
thermistors were removed today (Col. B interlock
was jumpered, and the target water inlet
  
  110   Thursday, April 03, 2014, 10:19 Isaac EarleStandard OperationTarget 2CoolingT2 Cooling Package Resin Can ReplacedThe resin can was removed from the T2 cooling
package and transported to the warm cell.
 A replacement can with fresh resin
 T2_Conductivity.jpg 
  144   Wednesday, March 04, 2015, 18:08 Isaac EarleRepairTarget 2CoolingT2 Cooling Package MRO UpdateThe following work was done today at the
T2 cooling package:
- Remainder of #4 Hansen o-rings
  
  311   Monday, January 16, 2023, 15:04 Adam NewsomeMaintenanceTarget 2CoolingT2 Cooling Package MRO - 2023 ShutdownT2 Cooling Package MRO began Jan. 16, 2023.
 
The following maintenance tasks have
 T2_FGSEC_old_vs_new_paddle.jpgT2_2023-03-07.PNG 
  106   Monday, March 24, 2014, 18:14 Isaac EarleStandard OperationTarget 2CoolingT2 Cooling Package & Air Amplifier StartedBill Rawnsley completed an electrical check
of the T2 profile monitor today from the
Meson Hall mezzanine - All OK.  
  
  270   Tuesday, October 27, 2020, 14:01 Isaac EarleRepairTarget 2CoolingT2 Collimator flow meter paddle wheel replacedThe T2 Collimator A flow meter signal (B1A:T2:FGCOLA)
began fluctuating and occasionally reading
0gpm on Sunday Oct 25 causing BL1A trips
  
  325   Wednesday, March 15, 2023, 15:56 Albert KongMaintenanceTarget 2ControlsT2 - M9 and M20 beam blocker actuation and vacuum test We tested the actuation of the M9/M20
beam blockers on the T2 monolith (3-4pm).
Vacuum levels remained steady throughout
 6x 
  285   Wednesday, March 16, 2022, 14:16 Matthew GareauStandard OperationOtherCoolingT1/T2 water packages drained to B1A AWHT, tested, and released. Also solenoid valve SV1 broken The T1/T2 water packages were drained
into the B1AAWHT (280L), the water was sampled
and tested by RPG, results included in elog.
 11_Mar_2022_Tritium_Records_T1_T2_from_RPG.pdfsolenoid_valve_SV1.jpg 
  336   Wednesday, January 10, 2024, 12:25 Albert KongStandard OperationOtherCoolingT1/T2 cooling packages drainedJan 10, 2024:
The cooling packages for T1/T2 was
drained this morning. ~150 L from each of
 T1T2EPICSPages.PNGIMG_3943.JPEGIMG_4231.JPEG 
  358   Friday, January 10, 2025, 18:36 Albert KongStandard OperationOtherCoolingT1/T2 cooling packages drainedThe T1 and T2 cooling packages were drained
starting at 14:36, by 14:48 both expansion
tanks had dried, meaning the draining rate
 CALCS_T1_T2_cooling_system_drain_speed.htmlTritium_Sample_and_Analysis_Form_-_T1_Cooling_Package_-_2025-01-10.pdfTritium_Sample_and_Analysis_Form_-_T2_Cooling_Package_-_2025-01-10.pdf 
  217   Thursday, March 30, 2017, 09:48 Isaac EarleDevelopmentOtherControlsT1/T2 control system de-glitching & target ID changes The following changes were made to
the T1/T2 PLC control system:
- De-glitching system investigated
  
  320   Wednesday, March 01, 2023, 13:10 Albert KongMaintenanceOtherCoolingT1/T2 Water Cooling Package Heat Exchanger Ball Valve Replacement3x 3/4" swagelok ball valves (2x at
T2 and 1x at T1) were replaced after the
water cooling line was shut off at the BL1A
 IMG_1452.JPEGIMG_1431.JPEGIMG_1438.JPEGIMG_1455.JPEG 
  318   Friday, February 17, 2023, 14:36 Albert KongRepairOtherWater LeakT1/T2 Water Cooling Package Ball Valve Replacement5 and 3 Swagelok ball valves were replaced
from the T1 and T2 cooling packages respectively.
These are compression fit valves,
 fdb0d111-3348-483d-a78f-98eabbc45507.jpg 
  184   Thursday, December 17, 2015, 13:31 Grant MinorDevelopmentOtherTargetT1/T2 Target Cassette - window / end cap manufacturing change (WO 41527)Isaac Earle has recently been managing
the fabrication of some new Be  target cassettes
for the T1 / T2 Meson Hall target ladders
 Left_new_right_old_ref_TBP1683_16Dec2015.JPGTBP1690_left_new_right_old_16Dec2015.JPGTBP1683_forming_tool_16Dec2015.JPGNew_Frame_Ref_TBP1696_16Dec2015.pdf 
  341   Friday, January 19, 2024, 17:07 Albert KongStandard OperationOtherTargetT1/T2 Profile Monitor, TGT Ladder, CUNO filter leak, Motor Coupling Inspection, + M9/M20 Blocker Actuation The following tasks were completed:

    Yesterday (Jan 18), the
T1/T2 cooling packages were inspected for
 7x 
  206   Tuesday, August 30, 2016, 14:09 Isaac EarleDevelopmentOtherControlsT1/T2 PLC Code Update A new version of the T1/T2 PLC code
has been uploaded to the PLC CPU.  The
main change in the new version is a fix to
  