Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
|
RH-Meson Hall |
Not logged in |
|
|
Message ID: 97
Entry time: Wednesday, January 15, 2014, 15:38
|
Author: |
Isaac Earle |
Category: |
Standard Operation |
Type: |
Target 2 |
Specific: |
Water Leak |
Subject: |
Suck Tube Drained and Rinsed |
|
|
The suck tube vessel was drained, rinsed, and transported to the active sink area in the Meson Hall Hot Cell Lab. There are no longer high fields from the suck tube and it is ready for future use. The filter, tubing, and flange used for filtering the active water were removed and bagged and are currently stored in the south-east corner of the warm cell. This bag measured up to 12mSv/hr on contact. There are small black particles visible inside the bag. The filtered water was sampled and will be released if approved by RPG. The bucket with the active water is stored in the active sink boot-box area.
Photos attached. |
|
|
|
|
|
|