Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 97     Entry time: Wednesday, January 15, 2014, 15:38
Author: Isaac Earle 
Category: Standard Operation 
Type: Target 2 
Specific: Water Leak 
Subject: Suck Tube Drained and Rinsed 

The suck tube vessel was drained, rinsed, and transported to the active sink area in the Meson Hall Hot Cell Lab.  There are no longer high fields from the suck tube and it is ready for future use.  The filter, tubing, and flange used for filtering the active water were removed and bagged and are currently stored in the south-east corner of the warm cell.  This bag measured up to 12mSv/hr on contact.  There are small black particles visible inside the bag.  The filtered water was sampled and will be released if approved by RPG.  The bucket with the active water is stored in the active sink boot-box area.

 

Photos attached.

Attachment 1: IMG_1276.JPG  355 kB  | Show | Hide all
Attachment 2: IMG_1291.JPG  276 kB  | Show | Hide all
Attachment 3: IMG_1295.JPG  278 kB  | Hide | Hide all
IMG_1295.JPG
Attachment 4: IMG_1296.JPG  253 kB  | Show | Hide all
Attachment 5: IMG_1297.JPG  243 kB  | Show | Hide all
ELOG V2.9.2-2455