Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 367     Entry time: Tuesday, June 03, 2025, 11:39
Author: Aaron Tam 
Category: Standard Operation 
Type: Other 
Specific: BL1A Holding Tank 
Subject: BL1A Active Water Holding Tank 

 June 3, 2025 - Albert Kong, Aaron Tam 

RPG finished analysis of the water sample and given approval for the contents of the holding tank to be released to city sewer

Procedure following Document-64834 Release No. 3 performed 

  • Starting volume sighted at 98cm mark ~
  • Approximately 100 minutes (9:05am-10:45am) pumping @ 1.70-1.80 USG/min 
  • Pumping till dry (pump noise noticeably changed when dry) (Dry pumping time max 30 seconds)

BL1A Active Water Holding Tank ready again to receive water from T1/T2/TNF.

 

 

Attachment 1: Sight_Glass_1.jpg  176 kB  | Show | Hide all
Attachment 2: Sight_Glass_2.jpg  187 kB  | Hide | Hide all
Sight_Glass_2.jpg
Attachment 3: Tank_conditions_to_start.jpg  225 kB  | Show | Hide all
Attachment 4: Tritium_Sample_and_Analysis_Form_-_T2_Cooling_Package_-_2025-01-10_-_Completed_2025-05-27.pdf  211 kB  Uploaded Tuesday, June 03, 2025, 13:34  | Show | Hide all
ELOG V2.9.2-2455