June 3, 2025 - Albert Kong, Aaron Tam
RPG finished analysis of the water sample and given approval for the contents of the holding tank to be released to city sewer
Procedure following Document-64834 Release No. 3 performed
- Starting volume sighted at 98cm mark ~
- Approximately 100 minutes (9:05am-10:45am) pumping @ 1.70-1.80 USG/min
- Pumping till dry (pump noise noticeably changed when dry) (Dry pumping time max 30 seconds)
BL1A Active Water Holding Tank ready again to receive water from T1/T2/TNF.
|