The uncovered VA8 section of beam pipe was surveyed in preparation for a visual inspection and some laser scanning.
Fields around the East and West elevated ledges of the beam pipe were around 100 uSv/hr. The pole monitor registered around 2mSv/hr on contact with the beam pipe indium joints.
------------------------
April 09:
We took recordings of the VA8 section using the remote pole camera () and took photos as well (attached).
|