Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 364     Entry time: Tuesday, April 08, 2025, 15:44
Author: Albert Kong 
Category: Other 
Type: Target 2 
Specific: Target 
Subject: VA8 Beampipe Section Radiation and Video Survey Note 

The uncovered VA8 section of beam pipe was surveyed in preparation for a visual inspection and some laser scanning.

Fields around the East and West elevated ledges of the beam pipe were around 100 uSv/hr. The pole monitor registered around 2mSv/hr on contact with the beam pipe indium joints.

------------------------

April 09:

We took recordings of the VA8 section using the remote pole camera () and took photos as well (attached).

 

Attachment 1: IMG_1679.JPEG  845 kB  | Show | Show all
Attachment 2: IMG_1680.JPEG  1.073 MB  | Show | Show all
Attachment 3: VA8_Photos_(09April20205).pdf  5.924 MB  Uploaded Wednesday, April 09, 2025, 19:36  | Show | Show all
ELOG V2.9.2-2455