RH-Meson Hall |
Not logged in |
|
|
Message ID: 35
Entry time: Wednesday, May 30, 2012, 15:39
|
Author: |
Isaac Earle |
Category: |
Repair |
Type: |
Target 1 |
Specific: |
Target |
Subject: |
West Side Manipulator Removed from Hot Cell |
|
|
The west side manipulator was removed from the hot cell using the new manipulator removal frame. The operation went smoothly and required about one hour with two operators after everything had been prepared. No contamination was found on the manipulator thru-tube or slave arm. Only 50cpm were measured on the wrist assembly of the slave end. |
|
|
|
|
|