Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 35     Entry time: Wednesday, May 30, 2012, 15:39
Author: Isaac Earle 
Category: Repair 
Type: Target 1 
Specific: Target 
Subject: West Side Manipulator Removed from Hot Cell 

 The west side manipulator was removed from the hot cell using the new manipulator removal frame.  The operation went smoothly and required about one hour with two operators after everything had been prepared.  No contamination was found on the manipulator thru-tube or slave arm.  Only 50cpm were measured on the wrist assembly of the slave end.

Attachment 1: IMG_0227.JPG  272 kB  | Hide | Hide all
IMG_0227.JPG
Attachment 2: IMG_0231.JPG  268 kB  | Show | Hide all
Attachment 3: IMG_0238.JPG  230 kB  | Show | Hide all
Attachment 4: IMG_0241.JPG  266 kB  | Show | Hide all
ELOG V2.9.2-2455