The resin flask on the T2 cooling package was exchanged today (new resin can prepped in the morning).
The newly installed resin flask was placed slightly off-set from the marking on the platform to ensure that the braided hose will clear the blocks when replaced at the end of shutdown.
The spent resin can was dropped off in the hot cell, ready to be prepped for drying.
See attached image for illustration of the rigging solution used, ~20 ft was covered by two sligs and a shackle to clear the MH mezzanine.
|