Message ID: 319     Entry time: Tuesday, February 21, 2023, 16:56
Author: Albert Kong 
Category: Maintenance 
Type: Target 2 
Specific: Other 
Subject: M20 BB moved to meson hall hot cell roof 

The M20 beam blocker was moved from the T2 monolith to the meson hall hot cell with the remote handling flask (completed ~4pm).

This operation was performed in preparation for M20 maintenance (main shaft o-ring replacement + air cylinder re-lubrication).

RPG surveyors measured 20,000 CPM from swiping the surface of the beam blocker shaft, and measured 25 mSv/hr on contact with the beam blocker.

Fields on the hot cell roof were at 100 uSv/hr at 0.5 meters from the top of the M20 BB. This should reduce drastically with the introduction of lead blanket shielding (see attached pictures). 

 

 

 

Attachment 1: IMG_1255.JPEG  2.250 MB  | Hide | Hide all