Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 276     Entry time: Thursday, February 17, 2022, 13:03
Author: Matthew Gareau 
Category: Maintenance 
Type: Target 1 
Specific: Target 
Subject: T1 MK2 wire scanner and protect monitor test removal and reattachment with pin straightening 

 this Work was done on 09 Dec 2021.

Since Isaac Earle was leaving Triumf he was giving us (maico, chad, adam, and myself) a demonstration of how to remove targets, protect monitor, and wire scanner. During the removal it was noticed that one of the pins for the wire scanner was bent and it would not be possible to reattach without straightening the pins.

Luckily the fields from the ladder were low enough (374 uSv/h) and we were able to retrieve the wire scanner and manually bend the pins back. The wire scanner was reattached without incident, and now will need diagnostics to check on the target ladder to ensure all is operational.

Attachment 1: IMG_20211207_140443.jpg  244 kB  | Show | Show all
Attachment 2: IMG_20211207_140508.jpg  298 kB  | Show | Show all
Attachment 3: IMG_20211207_140735.jpg  245 kB  | Show | Show all
Attachment 4: IMG_20211207_122631.jpg  200 kB  | Show | Show all
Attachment 5: IMG_20211207_142836.jpg  288 kB  | Show | Show all
ELOG V2.9.2-2455