Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 224     Entry time: Monday, July 10, 2017, 16:20
Author: Keith C Ng 
Category: Repair 
Type: Target 2 
Specific: Target 
Subject: T2 Heat Exchanger Secondary Side Solenoid Valve Failure  

The T2 heat exchanger secondary side solenoid failed on July 9 at approximately 19:30 (EPICS ID: B1A:T2CS:SVSEC).  The valve was replaced with a spare and the cooling package is now running normally.

The valve at this location also failed in November 2016:  https://elog.triumf.ca/TIS/RH-Meson+Hall/211  Further investigation will be attempted to determine if there is a root cause to the failure, or if it is a coincidence.

The attached OneNote PDF contains details of the work.  Cyclotron Fault #10119 has been returned.

Attachment 1: 20170710_t2_water_package_repair.pdf  1.047 MB  Uploaded Tuesday, July 11, 2017, 10:45  | Hide | Hide all
20170710_t2_water_package_repair.pdf 20170710_t2_water_package_repair.pdf 20170710_t2_water_package_repair.pdf 20170710_t2_water_package_repair.pdf
ELOG V2.9.2-2455