997
|
Wednesday, July 15, 2015, 11:02 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Coil Line Vacuum Leak Check | TM2 coil line R,U has been vacuum leaked
check at the hot cell and has passed with
no response from the leak detector. |
|
|
1000
|
Thursday, July 16, 2015, 14:36 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Status | IMG gauge, clip for ground to window lines
and gas line extensions were installed today.
David and I also tried to locate |
|
|
1001
|
Friday, July 17, 2015, 13:51 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Status | Gas lines extensions installed yesterday
were too long and gas lines touched top inside
of containment box. They have been removed |
|
|
1002
|
Monday, July 20, 2015, 14:12 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Status | Ultem high voltage spacer installed and
9 pin banana plug plugged in. Target has
been inserted into the hot cell and will |
|
|
1009
|
Wednesday, July 22, 2015, 12:13 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Short Findings | Pin X was unplugged, short remained, however
any slight pressure on the block towards
the source tray makes the short go away. |
|
|
1022
|
Tuesday, July 28, 2015, 14:36 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | SiC#31 | SiC#31 Autopsy | Extraction electrode was removed from SiC#31
and target inspected.
Pictures of findings can be found |
|
|
1023
|
Tuesday, July 28, 2015, 14:40 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | SiC#31 UCx#13 | SiC#31 removed UCx#13 installed | SiC#31 has been removed from TM4 and UCx#13
installed. UCx#13 connection to the 9 pin
connector was VERY VERY tight to the tube |
|
|
1033
|
Thursday, August 13, 2015, 09:17 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 status | Tuesday, August 11, insulator ITA6272
was installed onto the "pin x"
line (unused plasma electrode) and tested; |
|
|
1035
|
Thursday, August 13, 2015, 13:46 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Status | As previously mentioned, dump target installed
with new mounting and high current fasteners.
Leak Check complete and ready to |
|
|
1049
|
Wednesday, August 26, 2015, 10:55 |
chad fisher | South Hot-Cell | Repair | TM2 | ZrC#7 | New wiring and target | New wiring was installed yesterday as well
as ZrC#7 which had its high current fasteners
torqued to 130 in lbs. |
|
|
1065
|
Thursday, September 10, 2015, 08:55 |
chad fisher | South Hot-Cell | Repair | TM1 | | TM1 Window Leak Diag. | Vacuum leak check on the window line circuit
of TM1 took place yesterday and again to
confirm this morning. Both days the response |
|
|
1066
|
Thursday, September 10, 2015, 08:59 |
chad fisher | South Hot-Cell | Repair | | | Manipulator Mait. and field check Sept. 4 | Hot cell was entered for preventative mait.
on left manip. field measurements around
the cell were taken in prep. for window removal |
|
|
1069
|
Tuesday, September 15, 2015, 11:06 |
chad fisher | South Hot-Cell | Repair | TM1 | | TM1 Window Gasket Replacement | Replaced the custom silver gaskets on the
entrance window panel of TM1 this morning...this
has eliminated an sign of leak at this joint, |
|
|
1101
|
Wednesday, October 14, 2015, 14:03 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | ZrC#7 | ZrC#7 removed | ZrC#7 has been removed from TM2. Everything
looks good. |
|
|
1104
|
Thursday, October 15, 2015, 14:17 |
chad fisher | South Hot-Cell | Repair | TM2 | | Anode Connector Install and adjustment | The TM2 containment box was removed this
morning for installation of the 9 pin connector...connection.
The 9 pin connector copper tube connection |
|
|
1105
|
Monday, October 19, 2015, 11:53 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | SiC#32 | SiC#32 installed on TM2 | SiC#32 has been installed on TM2. High
current fasteners torqued to 130 in lbs. |
|
|
1109
|
Tuesday, October 20, 2015, 13:52 |
chad fisher | South Hot-Cell | Maintenance | | | TM4 Febiad coil line disposal | The febiad coil line removed from TM4 has
been cut into pieces small enough to be disposed
of in a 5 gal pal. The line was cut with |
|
|
1110
|
Wednesday, October 21, 2015, 09:49 |
chad fisher | South Hot-Cell | Repair | | | Manipulator handle repair | Rebuild handle of manipulator serial 7986
(currently in the east position) and replaced
broken snap ring 5555-18h on west side of |
|
|
1113
|
Friday, October 23, 2015, 11:30 |
chad fisher | South Hot-Cell | Standard Operation | | ZrC#7 | ZrC#7 Spent Move and Febiad Coil | ZrC#7 was transfered to a spent target
disposal pail today and removed from the
hot cell. The "hot" end of the |
|
|
1129
|
Tuesday, November 24, 2015, 13:54 |
chad fisher | South Hot-Cell | Repair | | | Cell Decon | Decon/removal of large solid waste was
performed on Wednesday November 18th."Hot"
activated items included containment box |
|