ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  1931   Friday, May 24, 2019, 09:11 Travis CaveSouth Hot-CellStandard OperationTM4no targetModule move TM#4 has been moved from the south
west silo to the south hot cell.
  
  1934   Friday, June 07, 2019, 08:56 Travis CaveConditioning StationStandard OperationTM4no targetModule move TM#4 has been moved from the south
hot cell to the conditioning station.
  
  1951   Tuesday, July 16, 2019, 08:44 Travis CaveConditioning StationStandard OperationTM4no targetModule move TM4 has been moved from the conditioning
station to the south west silo. Module was
placed with the turbo pump facing south which
  
  1969   Thursday, August 22, 2019, 09:20 Travis CaveSouth Hot-CellStandard OperationTM4no targetModule move TM#4 has been moved from the south
west silo to the south hot cell.
  
  2044   Thursday, January 09, 2020, 13:49 Travis CaveConditioning StationStandard OperationTM3no targetModule move TM#3 has been moved from the south
west silo to the conditioning station.
  
  2050   Thursday, January 16, 2020, 09:37 Travis CaveConditioning StationStandard OperationTM3no targetModule move TM#3 has been moved from the conditioning
station to the centre east silo.
  
  2085   Monday, March 16, 2020, 09:25 Travis CaveSouth Hot-CellStandard OperationTM4no targetModule move TM#4 has been moved from the silo
to the south hot cell.
  
  2102   Tuesday, June 16, 2020, 09:37 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule move TM#2 with no target has been moved
from the south west silo to the south hot
cell.
  
  2122   Tuesday, July 07, 2020, 09:16 Travis CaveConditioning StationStandard OperationTM3no targetModule move TM#3 has been moved from the silo
to the conditioning station, where David
and Frank will start on the gutting of the
  
  2124   Monday, July 13, 2020, 10:01 Travis CaveConditioning StationStandard OperationTM3no targetModule move TM#3 has been moved from the conditioning
station to the silo.
 
  
  2143   Tuesday, September 08, 2020, 10:37 Travis CaveITWStandard Operation no targetEntrance module move The West Entrance module has been
moved to the south hot cell for repairs.
  
  2152   Wednesday, September 30, 2020, 09:54 Travis CaveSouth Hot-CellStandard OperationTM3no targetModule move TM#3 is now in the south hot cell.   
  2224   Wednesday, June 09, 2021, 09:16 Travis CaveNorth Hot-CellStandard OperationTM2no targetModule move TM#2 has been moved from the SHC
to the NHC.
  
  1814   Wednesday, October 31, 2018, 14:23 Travis CaveSouth Hot-CellStandard OperationTM2nSiC#1 and UC#25Electrical Check TM#2 with targets nSiC#1 (old target)
and UC#25 (new target) electrical check results.
See attached for details.
 Electrical_Chk__TM#2_nSiC#1_SHC_Post_Beam_Oct-31-2018.pdfElectrical_Chk_TM#2_UC#25_SHC_Oct-31-2018.pdf 
  1786   Thursday, September 20, 2018, 14:35 Travis CaveSouth Hot-CellStandard OperationTM2nSiC#1Electrical Check TM#2 with the nSiC#1 target had its
check done on it at the south hot cell see
attached for results.
 Electrical_Chk_TM2_SHC_nSiC#1_Sept-20-2018.pdf 
  1787   Thursday, September 20, 2018, 14:36 Travis CaveITWStandard OperationTM2nSiC#1Module move TM#2 with nSiC#1 has been moved from
the south hot cell to the west target station.
  
  1793   Tuesday, September 25, 2018, 08:01 chad fisherSouth Hot-CellStandard OperationTM2nSiC#1nSiC#1 installOn September 18th installation of nSiC#1
was attempted on TM2. As usual, new fasteners
were tested previous to insertion into hot
 20180919_132304.jpg20180919_143535.jpg 
  1812   Tuesday, October 30, 2018, 10:50 Travis CaveITWStandard OperationTM2nSiC#1Modules moved Modules were moved, ITW EX2 was moved
from the conditioning station to the west
target station and TM#2 ,with nSiC#1, 
  
  1816   Monday, November 05, 2018, 08:24 Travis CaveSpent Target VaultStandard Operation nSiC#1Spent Target Move The spent nSiC#1 target has been
moved from the south hot cell to the spent
target vault. It was placed in pail #172
 Target_Index_2018-11-02.pdf 
  2604   Tuesday, June 04, 2024, 11:44 Carla BabcockSouth Hot-CellDevelopment empty LP FEBIADinvestigation of cathode short on empty LP FEBIADOn May 30 Aaron, Chad and I removed the
empty LP FEBIAD target from the SHC into
the anteroom to attempt to find out the source
 MicrosoftTeams-image_(58).png 