Friday, May 24, 2019, 09:11, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, Module move
|
TM#4 has been moved from the south west silo to the south hot cell. |
Friday, June 07, 2019, 08:56, Travis Cave, Conditioning Station, Standard Operation, TM4, no target, Module move
|
TM#4 has been moved from the south hot cell to the conditioning station. |
Tuesday, July 16, 2019, 08:44, Travis Cave, Conditioning Station, Standard Operation, TM4, no target, Module move
|
TM4 has been moved from the conditioning station to the south west silo. Module was placed with the turbo pump facing south which puts the windows
facing north and south and the shutter facing west. |
Thursday, August 22, 2019, 09:20, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, Module move
|
TM#4 has been moved from the south west silo to the south hot cell. |
Thursday, January 09, 2020, 13:49, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, Module move
|
TM#3 has been moved from the south west silo to the conditioning station. |
Thursday, January 16, 2020, 09:37, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, Module move
|
TM#3 has been moved from the conditioning station to the centre east silo. |
Monday, March 16, 2020, 09:25, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, Module move
|
TM#4 has been moved from the silo to the south hot cell. |
Tuesday, June 16, 2020, 09:37, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Module move
|
TM#2 with no target has been moved from the south west silo to the south hot cell. |
Tuesday, July 07, 2020, 09:16, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, Module move
|
TM#3 has been moved from the silo to the conditioning station, where David and Frank will start on the gutting of the module. |
Monday, July 13, 2020, 10:01, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, Module move
|
TM#3 has been moved from the conditioning station to the silo.
|
Tuesday, September 08, 2020, 10:37, Travis Cave, ITW, Standard Operation, , no target, Entrance module move
|
The West Entrance module has been moved to the south hot cell for repairs. |
Wednesday, September 30, 2020, 09:54, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, Module move
|
TM#3 is now in the south hot cell. |
Wednesday, June 09, 2021, 09:16, Travis Cave, North Hot-Cell, Standard Operation, TM2, no target, Module move
|
TM#2 has been moved from the SHC to the NHC. |
Wednesday, October 31, 2018, 14:23, Travis Cave, South Hot-Cell, Standard Operation, TM2, nSiC#1 and UC#25, Electrical Check
|
TM#2 with targets nSiC#1 (old target) and UC#25 (new target) electrical check results. See attached for details. |
Thursday, September 20, 2018, 14:35, Travis Cave, South Hot-Cell, Standard Operation, TM2, nSiC#1, Electrical Check
|
TM#2 with the nSiC#1 target had its check done on it at the south hot cell see attached for results. |
Thursday, September 20, 2018, 14:36, Travis Cave, ITW, Standard Operation, TM2, nSiC#1, Module move
|
TM#2 with nSiC#1 has been moved from the south hot cell to the west target station. |
Tuesday, September 25, 2018, 08:01, chad fisher, South Hot-Cell, Standard Operation, TM2, nSiC#1, nSiC#1 install
|
On September 18th installation of nSiC#1 was attempted on TM2. As usual, new fasteners were tested previous to insertion into hot cell and employed during
installation. the last fastener to be installed was for the circuit D block. The fastener/air ratchet stalled immediately indicating a problem. The fastener
was removed and a an attempt was made trying a new spare fastener. That fastener also jammed right away but could not be removed or installed any further. |
Tuesday, October 30, 2018, 10:50, Travis Cave, ITW, Standard Operation, TM2, nSiC#1, Modules moved
|
Modules were moved, ITW EX2 was moved from the conditioning station to the west target station and TM#2 ,with nSiC#1, was moved from the
west target station to the south hot cell. |
Monday, November 05, 2018, 08:24, Travis Cave, Spent Target Vault, Standard Operation, , nSiC#1, Spent Target Move
|
The spent nSiC#1 target has been moved from the south hot cell to the spent target vault. It was placed in pail #172 and placed in spot 7B. See
attached PDF for vault details. |
Tuesday, June 04, 2024, 11:44, Carla Babcock, South Hot-Cell, Development, , empty LP FEBIAD, investigation of cathode short on empty LP FEBIAD
|
On May 30 Aaron, Chad and I removed the empty LP FEBIAD target from the SHC into the anteroom to attempt to find out the source of the cathode short
observed online. The behaviour online was that a connection of several hundred ohms was preventing the cathode from being biased. The resistance was still
enough to allow us to run in anode mode, which is what we did. I am not sure where the cathode short came from but there was significant sparking on this |
|