ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
2145
|
Tuesday, September 22, 2020, 10:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#30 | Module move |
TM#4 with UC#30 has been moved from ITE to the south hot cell. |
2150
|
Tuesday, September 29, 2020, 12:29 |
Travis Cave | ITE | Standard Operation | TM4 | UC#31 | Module move |
Module move of TM#4 with UC#31 was finished to today at around 10:30AM. |
2152
|
Wednesday, September 30, 2020, 09:54 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | Module move |
TM#3 is now in the south hot cell. |
2153
|
Tuesday, October 13, 2020, 10:16 |
Travis Cave | ITE | Repair | TM4 | UC#31 | Module move |
TM#4 is now in the south hot cell from the east target station. |
2154
|
Thursday, October 15, 2020, 12:48 |
Travis Cave | ITE | Standard Operation | TM4 | UC#31 | Module move |
TM#4 is now back in the east target station. |
2155
|
Friday, October 16, 2020, 10:36 |
Travis Cave | ITW | Standard Operation | TM2 | Ta#60 | Module move |
TM#2 with Ta#60 is now in the south hot cell. |
2157
|
Tuesday, October 20, 2020, 10:14 |
Travis Cave | ITW | Standard Operation | TM2 | C#2 | Module move |
TM#2 with C#2 has been moved from the south hot cell to the West Target Station. |
2160
|
Tuesday, November 03, 2020, 10:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#31 | Module move |
TM#4 with UC#31 has been moved from the east target station to the south hot cell. |
2162
|
Thursday, November 05, 2020, 10:48 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#61 | Module move |
TM#4 with Ta#61 has been moved from the south hot cell to the east target station. |
2177
|
Friday, January 08, 2021, 09:40 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#61 | Module move |
TM#4 with Ta#61 has been moved from the east target station to the south hot cell. |
2179
|
Tuesday, January 19, 2021, 11:32 |
Travis Cave | Safe Module Parking | Standard Operation | TM2 | Nb#9 | Module move |
TM#2 with Nb#9 was moved from ITW to SHC and then with no target it was moved from the SHC to the SMP. |
2224
|
Wednesday, June 09, 2021, 09:16 |
Travis Cave | North Hot-Cell | Standard Operation | TM2 | no target | Module move |
TM#2 has been moved from the SHC to the NHC. |
2243
|
Tuesday, September 14, 2021, 09:18 |
Travis Cave | South Hot-Cell | Repair | TM4 | SiC#40 | Module move |
TM#4 with SiC#40 has been moved from the east target station to the south hot cell. |
2244
|
Wednesday, September 15, 2021, 08:39 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#41 | Module move |
TM#4 with SiC#41 has been moved from the NHC to ITE. |
2248
|
Tuesday, September 21, 2021, 13:47 |
Travis Cave | North Hot-Cell | Standard Operation | TM2 | UC#34 | Module move |
TM#2 with UC#34 has been moved from ITW to the north hot cell had the target removed and then moved to the south west silo. |
2251
|
Monday, September 27, 2021, 14:29 |
Travis Cave | ITW | Standard Operation | TM2 | Graphite #3 | Module move |
TM#2 with C#3 has been moved from the north hot cell to ITW. Also for the up coming site wide power outage, the ISAC Target Hall crane has been turned off and powered down, also the remote crane console has also been power down as well so that mean no ISAC TV for a few days. |
2255
|
Monday, October 04, 2021, 10:52 |
Travis Cave | North Hot-Cell | Standard Operation | TM4 | SiC#41 | Module move |
TM#2 moved from ITE to NHC SiC#41 removed and then moved back to ITE. |
2043
|
Wednesday, January 08, 2020, 10:34 |
David Wang | Assembly/Bench Test | Development | | | Module lifting assembly ITA0490 |
The second module lifting assembly ITA0490 is moved into TH and installed onto TM3 . It will stay with TM3. I adjusted the CofG on the assembly. It is same to the first lifting assembly we are using now. After adjustment, The installation of assembly on TM3 are smooth. |
2443
|
Monday, May 22, 2023, 15:06 |
Carla Babcock | ITE | Standard Operation | TM4 | TiC#5 | Module conditioning |
Yesterday and today module conditioning was done on Tm4 in ITE. This is the first ramp up after the shutdown and ITE is planned to run at high voltages for the first weeks. The module is behaving well - went up to 40kV yesterday, stayed there for an hour, and up to 46kV today. Current draw is 113uA at 46kV. No serious sparking.
Tuesday, May 23, 2023, 09:32 : Ramping up again, easy to 45kV. Drawing 132uA at 49kV. Still behaving quite well. |
2453
|
Tuesday, June 06, 2023, 17:36 |
Carla Babcock | ITW | Standard Operation | TM2 | TiC#6 | Module conditioning |
Conditioned TM2 up to 48kV in ITW. Some sparks and current is not very stable. Drawing about 178uA at 48kV. |