ID Date Author Category Type Module Target/Number Subjectdown
  2145   Tuesday, September 22, 2020, 10:56 Travis CaveSouth Hot-CellStandard OperationTM4UC#30Module move

 TM#4 with UC#30 has been moved from ITE to the south hot cell.

  2150   Tuesday, September 29, 2020, 12:29 Travis CaveITEStandard OperationTM4UC#31Module move

 Module move of TM#4 with UC#31 was finished to today at around 10:30AM.

  2152   Wednesday, September 30, 2020, 09:54 Travis CaveSouth Hot-CellStandard OperationTM3no targetModule move

 TM#3 is now in the south hot cell.

  2153   Tuesday, October 13, 2020, 10:16 Travis CaveITERepairTM4UC#31Module move

 TM#4 is now in the south hot cell from the east target station.

  2154   Thursday, October 15, 2020, 12:48 Travis CaveITEStandard OperationTM4UC#31Module move

 TM#4 is now back in the east target station.

  2155   Friday, October 16, 2020, 10:36 Travis CaveITWStandard OperationTM2Ta#60Module move

 TM#2 with Ta#60 is now in the south hot cell.

  2157   Tuesday, October 20, 2020, 10:14 Travis CaveITWStandard OperationTM2C#2Module move

 TM#2 with C#2 has been moved from the south hot cell to the West Target Station.

  2160   Tuesday, November 03, 2020, 10:52 Travis CaveSouth Hot-CellStandard OperationTM4UC#31Module move

 TM#4 with UC#31 has been moved from the east target station to the south hot cell.

  2162   Thursday, November 05, 2020, 10:48 Travis CaveITEStandard OperationTM4Ta#61Module move

 TM#4 with Ta#61 has been moved from the south hot cell to the east target station.

  2177   Friday, January 08, 2021, 09:40 Travis CaveSouth Hot-CellStandard OperationTM4Ta#61Module move

 TM#4 with Ta#61 has been moved from the east target station to the south hot cell.

  2179   Tuesday, January 19, 2021, 11:32 Travis CaveSafe Module ParkingStandard OperationTM2Nb#9Module move

 TM#2 with Nb#9 was moved from ITW to SHC and then with no target it was moved from the SHC to the SMP.

  2224   Wednesday, June 09, 2021, 09:16 Travis CaveNorth Hot-CellStandard OperationTM2no targetModule move

 TM#2 has been moved from the SHC to the NHC.

  2243   Tuesday, September 14, 2021, 09:18 Travis CaveSouth Hot-CellRepairTM4SiC#40Module move
TM#4 with SiC#40 has been moved from the east target station to the south hot cell.
  2244   Wednesday, September 15, 2021, 08:39 Travis CaveITEStandard OperationTM4SiC#41Module move

TM#4 with SiC#41 has been moved from the NHC to ITE.

  2248   Tuesday, September 21, 2021, 13:47 Travis CaveNorth Hot-CellStandard OperationTM2UC#34Module move

 TM#2 with UC#34 has been moved from ITW to the north hot cell had the target removed and then moved to the south west silo.

  2251   Monday, September 27, 2021, 14:29 Travis CaveITWStandard OperationTM2Graphite #3Module move

 TM#2 with C#3 has been moved from the north hot cell to ITW. Also for the up coming site wide power outage, the ISAC Target Hall crane has been turned off and powered down, also the remote crane console has also been power down as well so that mean no ISAC TV for a few days.

  2255   Monday, October 04, 2021, 10:52 Travis CaveNorth Hot-CellStandard OperationTM4SiC#41Module move

 TM#2 moved from ITE to NHC SiC#41 removed and then moved back to ITE.

  2043   Wednesday, January 08, 2020, 10:34 David WangAssembly/Bench TestDevelopment  Module lifting assembly ITA0490

The second module lifting assembly ITA0490 is moved into TH and installed onto TM3 . It will stay with TM3. I adjusted the  CofG on the assembly. It is same to the first lifting assembly we are using now. After adjustment, The installation of assembly on TM3 are smooth. 

  2443   Monday, May 22, 2023, 15:06 Carla BabcockITEStandard OperationTM4TiC#5Module conditioning

Yesterday and today module conditioning was done on Tm4 in ITE. This is the first ramp up after the shutdown and ITE is planned to run at high voltages for the first weeks. The module is behaving well - went up to 40kV yesterday, stayed there for an hour, and up to 46kV today. Current draw is 113uA at 46kV. No serious sparking.

 

Tuesday, May 23, 2023, 09:32 :  Ramping up again, easy to 45kV. Drawing 132uA at 49kV. Still behaving quite well.

  2453   Tuesday, June 06, 2023, 17:36 Carla BabcockITWStandard OperationTM2TiC#6Module conditioning

Conditioned TM2 up to 48kV in ITW. Some sparks and current is not very stable. Drawing about 178uA at 48kV.