Wednesday, August 10, 2016, 11:30, David Wang, ITE, Standard Operation, TM4, UC#17, TM4 has been connected at ITE
|
Dan and I connected TM4 in ITE yesterday. It is pumping down at ITE now. Everything is fine so far. |
Wednesday, August 10, 2016, 09:44, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, module moved
|
TM#3 has been moved from the north east silo to the conditioning station. |
Tuesday, August 09, 2016, 11:36, Anders Mjos, Conditioning Station, Maintenance, , , RGA and CG1S moved 
|
The locations (ports) for the RGA and CG1S was swapped today by Anders and Isaac to provide clearance for the North Hot Cell ventilation. Attached
photos show old and new locations. |
Tuesday, August 09, 2016, 10:05, Travis Cave, ITE, Standard Operation, TM4, UC#17, module moved
|
TM#4 with UC#17 is now in the east target station. |
Tuesday, August 09, 2016, 07:15, David Wang, Conditioning Station, Standard Operation, TM4, UCx17, TM4 has been disconnected at TCS
|
I stopped TCS water pumps this morning . The argon venting for TCS is in processing. |
Monday, August 08, 2016, 11:24, chad fisher, South Hot-Cell, Maintenance, , , Anteroom Clean-up - Waveguide
|
The wave guide from TM3 has been surveyed, swiped and removed from the anteroom and transported to rad waste for disposal. The wave guide has been stored
in the anteroom since its removal. |
Friday, August 05, 2016, 14:13, Isaac Earle, North Hot-Cell, Development, , , Preparations for NHC Ventilation Test
|
A hole was drilled in the NHC exhaust duct in the east end of the target hall above the hatch to the Ante Room. This will be used for measuring
NHC exhaust flow rate with a thermal anemometer. The hole was tapped and plugged with an NPT tap.
Flow was measured in the existing hole in the SHC exhaust duct in approximately the same location. Flow velocity was measured to be 1415 |
Friday, August 05, 2016, 13:50, chad fisher, South Hot-Cell, Maintenance, , , Anteroom clean out
|
Some items have been removed from the anteroom in preparation for painting. Items have been placed on plastic in the south hot cell service area. No
contamination found so far. |
Thursday, August 04, 2016, 08:56, Travis Cave, Spent Target Vault, Standard Operation, , UC#16, Spent Target move
|
The spent UC #16 have been moved from the south hot cell to the storage vault see attached PDF for details. |
Wednesday, August 03, 2016, 10:02, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#17, Electrical Check
|
The result of yesterdays electrical check on TM#4 with UC#17. |
Wednesday, August 03, 2016, 09:56, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule for beam schedule 130 (Apr- Oct, 2016) 
|
Update schedule weekly. See attachments 1,2 |
Wednesday, August 03, 2016, 09:49, David Wang, Conditioning Station, Standard Operation, TM4, , TM4 is ready for conditioing at TCS.
|
I started TCS water system and installed HV cover onto TM4. The TM4 containment box is supplied with water also. TM4 is ready for conditioning
at TCS. |
Wednesday, August 03, 2016, 09:45, David Wang, Conditioning Station, Standard Operation, TM4, UC#17, Helium pressure test on TM4 HS line at TCS
|
Helium pressure test on TM4 HS line at TCS is done.Leak detector 0.0X E-9atm.cc/sec. 5minutes, 70psi helium. No response
on LD. |
Wednesday, August 03, 2016, 09:15, chad fisher, South Hot-Cell, Repair, , , Manipulator
|
East manipulator on the south hot cell is showing signs of eminent wrist/tong cable failure. Some slight slippage was noted yesterday and confirmed by
a snapping sound and more slippage tomorrow. |
Wednesday, August 03, 2016, 08:08, Anders Mjos, Conditioning Station, Standard Operation, TM4, UC#17, Conditioning UC#17  
|
Wednesday, August 03, 2016, 08:08: RGA on
Wednesday, August 03, 2016, 11:25: Configured EE to be connected to EE PS (not grounded)
Wednesday, August 03, 2016, 11:25: PS on |
Tuesday, August 02, 2016, 15:22, David Wang, Conditioning Station, Standard Operation, TM4, UC#17, TM4 with new target has been connected at TCS
|
It is being pumped now at TCS. |
Tuesday, August 02, 2016, 14:52, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#17, module moved
|
TM#4 with UC#17 is now in the conditioning station. |
Tuesday, August 02, 2016, 13:32, chad fisher, South Hot-Cell, Standard Operation, TM4, UC#16, UC#16 Removed #17 installed
|
UCx#16 has been removed from TM$ and UCx#17 installed, high current conductors toqued to 130 in lbs.
UCx#16 did not show the standard arcing marks on the 9 pin connector. |
Tuesday, August 02, 2016, 11:02, Travis Cave, ITE, Standard Operation, TM4, UC#16, module moved
|
TM#4 with UC#16 has been moved from the east station to the south hot cell. The shield plug was also install remotely once it was hooked up due to alphas. |
Friday, July 29, 2016, 14:27, Isaac Earle, North Hot-Cell, Development, , , North Hot Cell Measurements & Cleanup
|
The North Hot Cell was accessed today via the Ante Room for inspection, measurements,
and clean-up. There were no modules in the SHC or TCS, and no spent targets in the SHC. Under these conditions the maximum field in the NHC
was approximately 2μSv/hr. The inside of the cell was cleaned and swept, followed |
|