ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
1220
|
Monday, May 02, 2016, 11:33 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | module moved |
TM#2 was moved to the SW Silo from the Conditioning Station. TM#3 was from from the NW Silo to the Conditioning Station. |
1224
|
Monday, May 09, 2016, 10:13 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module moved |
TM#3 was moved from the conditioning station to the NE Silo. TM#2 was moved from the SW Silo to the South hot cell. |
1239
|
Thursday, May 19, 2016, 10:35 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module moved |
TM#1 has been moved from the south hot cell to the north west silo. |
1247
|
Tuesday, May 31, 2016, 09:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module moved |
TM#3 has been moved from the NE Silo to the south hot cell. |
1248
|
Thursday, June 02, 2016, 08:44 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | Electrical Check |
Electrical check of TM#3 no target at the south hot cell. see attached for results. |
Attachment 1: TM3_elec_chk_no_tgt.PDF
|
|
1251
|
Friday, June 03, 2016, 11:35 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module moved |
TM#3 has been moved back to the north east silo. |
1284
|
Wednesday, July 13, 2016, 08:47 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | module moved |
TM#3 has been moved from the north east silo to the conditioning station. |
1287
|
Monday, July 18, 2016, 13:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module moved |
TM#3 is now in the south hot cell. |
1293
|
Thursday, July 28, 2016, 11:27 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | module moved |
TM#3 with no target has been moved from the conditioning station to the NE silo. |
1312
|
Wednesday, August 10, 2016, 09:44 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | module moved |
TM#3 has been moved from the north east silo to the conditioning station. |
1325
|
Thursday, August 18, 2016, 14:19 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | module moved |
TM#3 is now back in the the north east silo. |
1346
|
Wednesday, September 07, 2016, 11:44 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | module moved |
TM#3 has been moved from the NE Silo to the conditioning station. |
1352
|
Wednesday, September 14, 2016, 13:53 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move |
TM#3, no target, has been moved from the conditioning station to the north east silo. |
1372
|
Wednesday, October 19, 2016, 11:46 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module moved |
TM#2 has been moved from the south hot cell to the south west silo. |
1378
|
Monday, October 24, 2016, 11:34 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module moved |
TM#2 has been moved from the south west silo to the south hot cell. |
1455
|
Tuesday, March 21, 2017, 10:06 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | no target | module moved |
TM#4 has been moved from the SW Silo to the conditioning station. |
1466
|
Monday, March 27, 2017, 13:40 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Electrical Check |
Did the start of the running year electrical checks of both TM#2 and TM#4 with no target attached to either module. TM#2 was in the south hot cell and TM#4 is in the conditioning station under vacuum. |
Attachment 1: TM2__No_Tgt.PDF
|
|
Attachment 2: TM4__No_Tgt.PDF
|
|
1467
|
Tuesday, March 28, 2017, 09:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module moved |
TM#4 has been moved from the conditioning station to the south hot cell. |
1478
|
Wednesday, April 05, 2017, 09:46 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | no target | module moved |
TM#1 has been moved from the North West silo to the conditioning station. |
1484
|
Friday, April 07, 2017, 09:53 |
Travis Cave | Conditioning Station | Maintenance | TM1 | no target | Electrical Check and TM1 other checks |
Results of an electrical check on TM#1 with no target attached to it.
I use this e-log entry for TM1 notes as well 1. TM1 IG1 is a dual filament gauge . Its filament is very close to grid now. It shorted one time during the pumping down. It still works fine so far . But, we may need to change it if we use this module in TS again.
TCS 1G1 and 1G1S are pumped to 5Xe-6 torr. IG2 stayed at 2.5XE-5 torr. Since no target is installed on module , I capped top of HS water line. Maybe, the small o-ring seal in cap is too old, I found a big leak on this seal when i use LD check it. That is the reason IG2 stayed too high. Still, Leak check and helium presuure test are fulfilled on TM1. Leak detector BLR 5XE-7 atm.cc/sec, BP 0.0XE-4 torr9. Back up pressure is 51 mtorr which is high because of leak on HS line cap seal so LD BLR is high. At this level, Ta+-, Tube +-, MSP, EE are good. Other air to vacuum seal are good as well at this leak rate. I will check and change small o-ring seal in HS cap. The TM1 is functional basically. |
Attachment 1: TM1_elec_chk_no_tgt.PDF
|
|