ID Date Author Categorydown Type Module Target/Number Subject
  1191   Tuesday, April 05, 2016, 09:33 Travis CaveITWStandard OperationTM1UC#15module moved

TM#1 with UC#15 have been moved from the conditioning station to the west target station.

  1192   Tuesday, April 05, 2016, 12:36 David WangITWStandard OperationTM1 TM1 vacuum system has been connected in ITW.

 All turbo -pumps are started.

  1199   Friday, April 08, 2016, 07:13 David WangITWStandard OperationTM1UCx15TM1 has been connected in ITW.

After ITW HV test is done, TM1 has been connected to ITW. Water signals are checked in electrical room. They are good.

  1201   Friday, April 08, 2016, 08:48 David WangITWStandard Operation  ITW water signal interlock check.

I did a ITW water signals interlock check with ISAC opp. They are checked once a year before first beam on.

2016-04-13 Same test is done on ITE also. Everything is good.

  1212   Thursday, April 14, 2016, 12:56 David WangITWStandard OperationTM1 5 shielding blocks have been moved to ITW.

The ITW is configured to take proton beam.

  1234   Monday, May 16, 2016, 11:16 David WangITWStandard OperationTM1 ITW, TM1 turbo-pumps are swithched off

I let isac opp switched off ITW turbo-pumps. The argon vent valve in electrical room is opened. The ITW argon venting will be started  soon.

  1237   Tuesday, May 17, 2016, 14:15 Travis CaveITWStandard OperationTM1UC#15module moved

TM#1 with UC#15 was moved back to the west station due to alpha concerns.

  1245   Wednesday, May 25, 2016, 10:57 Travis CaveITWStandard OperationTM2Ta#48module moved

TM#2 with Ta#48 has been moved from conditioning station to the west target station.

  1246   Wednesday, May 25, 2016, 14:08 David WangITWStandard OperationTM2Ta#48TM2 has been connected in ITW

TM2 has been connected in ITW by Dan.M and David.W. All turbo-pumps have been started. Everything is good so fine.

  1271   Wednesday, July 06, 2016, 07:03 David WangITWStandard OperationTM2 TM2 was connected in ITW.

TM2 was disconnected in ITW and moved to SHC.

  1281   Tuesday, July 12, 2016, 09:59 Travis CaveITWStandard OperationTM2SiC#33module moved

TM#2 with SiC#33 has been moved from the conditioning station to the west target station.

  1282   Tuesday, July 12, 2016, 12:40 David WangITWStandard OperationTM2 TM2 has been connected in ITW

All turbo-pumps are started. Everything is good so far.

  1331   Wednesday, August 24, 2016, 10:41 David WangITWStandard OperationTM2 TM2 was disconnected in ITW yesterday.

TM2 was disconnected in ITW yesterday and moved to SHC.

  1342   Tuesday, August 30, 2016, 10:35 Travis CaveITWStandard OperationTM2Ta#49module moved

TM#2 with Ta#49 has been moved to the west target station from the conditioning station.

  1343   Tuesday, August 30, 2016, 13:17 David WangITWStandard OperationTM2 TM2 has been connected at ITW

  ITW turbo pumps  have been started.

  1344   Tuesday, September 06, 2016, 10:05 David WangITWStandard OperationTM2 5 Shielding blocks have been transferred from ITE to ITW.

5shielding blocks have been transferred from ITE to ITE. ITW is configured to take proton beam.

  1369   Tuesday, October 11, 2016, 10:36 Travis CaveITWStandard OperationTM2Ta#49module moved

TM#2 with Ta#49 has been moved from the west target station to the south hot cell.

  1370   Wednesday, October 12, 2016, 10:00 David WangITWStandard OperationTM2 TM2 was disconnected at ITW

TM2 was disconnected at ITW. 3 water circuits in ITW gave been looped to keep 75 GPM water flow to ITW. HS line was purged at HS. RPG got the water sample.

  1383   Tuesday, October 25, 2016, 15:10 David WangITWStandard OperationTM2 TM2 has been connected at ITW

All turbo pumps are started. Two gas valves for Febiad run are opened. Pumping down is good so far.

  1410   Tuesday, November 29, 2016, 12:57 David WangITWStandard OperationTM2 TM2 is connected in ITW

All turbo pumps are started. Water system and water signals have been checked. Pumping down on ITW and TM2 is good so far.