1191
|
Tuesday, April 05, 2016, 09:33 |
Travis Cave | ITW | Standard Operation | TM1 | UC#15 | module moved |
TM#1 with UC#15 have been moved from the conditioning station to the west target station. |
1192
|
Tuesday, April 05, 2016, 12:36 |
David Wang | ITW | Standard Operation | TM1 | | TM1 vacuum system has been connected in ITW. |
All turbo -pumps are started. |
1199
|
Friday, April 08, 2016, 07:13 |
David Wang | ITW | Standard Operation | TM1 | UCx15 | TM1 has been connected in ITW. |
After ITW HV test is done, TM1 has been connected to ITW. Water signals are checked in electrical room. They are good. |
1201
|
Friday, April 08, 2016, 08:48 |
David Wang | ITW | Standard Operation | | | ITW water signal interlock check. |
I did a ITW water signals interlock check with ISAC opp. They are checked once a year before first beam on.
2016-04-13 Same test is done on ITE also. Everything is good. |
1212
|
Thursday, April 14, 2016, 12:56 |
David Wang | ITW | Standard Operation | TM1 | | 5 shielding blocks have been moved to ITW. |
The ITW is configured to take proton beam. |
1234
|
Monday, May 16, 2016, 11:16 |
David Wang | ITW | Standard Operation | TM1 | | ITW, TM1 turbo-pumps are swithched off |
I let isac opp switched off ITW turbo-pumps. The argon vent valve in electrical room is opened. The ITW argon venting will be started soon. |
1237
|
Tuesday, May 17, 2016, 14:15 |
Travis Cave | ITW | Standard Operation | TM1 | UC#15 | module moved |
TM#1 with UC#15 was moved back to the west station due to alpha concerns. |
1245
|
Wednesday, May 25, 2016, 10:57 |
Travis Cave | ITW | Standard Operation | TM2 | Ta#48 | module moved |
TM#2 with Ta#48 has been moved from conditioning station to the west target station. |
1246
|
Wednesday, May 25, 2016, 14:08 |
David Wang | ITW | Standard Operation | TM2 | Ta#48 | TM2 has been connected in ITW |
TM2 has been connected in ITW by Dan.M and David.W. All turbo-pumps have been started. Everything is good so fine. |
1271
|
Wednesday, July 06, 2016, 07:03 |
David Wang | ITW | Standard Operation | TM2 | | TM2 was connected in ITW. |
TM2 was disconnected in ITW and moved to SHC. |
1281
|
Tuesday, July 12, 2016, 09:59 |
Travis Cave | ITW | Standard Operation | TM2 | SiC#33 | module moved |
TM#2 with SiC#33 has been moved from the conditioning station to the west target station. |
1282
|
Tuesday, July 12, 2016, 12:40 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been connected in ITW |
All turbo-pumps are started. Everything is good so far. |
1331
|
Wednesday, August 24, 2016, 10:41 |
David Wang | ITW | Standard Operation | TM2 | | TM2 was disconnected in ITW yesterday. |
TM2 was disconnected in ITW yesterday and moved to SHC. |
1342
|
Tuesday, August 30, 2016, 10:35 |
Travis Cave | ITW | Standard Operation | TM2 | Ta#49 | module moved |
TM#2 with Ta#49 has been moved to the west target station from the conditioning station. |
1343
|
Tuesday, August 30, 2016, 13:17 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been connected at ITW |
ITW turbo pumps have been started. |
1344
|
Tuesday, September 06, 2016, 10:05 |
David Wang | ITW | Standard Operation | TM2 | | 5 Shielding blocks have been transferred from ITE to ITW. |
5shielding blocks have been transferred from ITE to ITE. ITW is configured to take proton beam. |
1369
|
Tuesday, October 11, 2016, 10:36 |
Travis Cave | ITW | Standard Operation | TM2 | Ta#49 | module moved |
TM#2 with Ta#49 has been moved from the west target station to the south hot cell. |
1370
|
Wednesday, October 12, 2016, 10:00 |
David Wang | ITW | Standard Operation | TM2 | | TM2 was disconnected at ITW |
TM2 was disconnected at ITW. 3 water circuits in ITW gave been looped to keep 75 GPM water flow to ITW. HS line was purged at HS. RPG got the water sample. |
1383
|
Tuesday, October 25, 2016, 15:10 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been connected at ITW |
All turbo pumps are started. Two gas valves for Febiad run are opened. Pumping down is good so far. |
1410
|
Tuesday, November 29, 2016, 12:57 |
David Wang | ITW | Standard Operation | TM2 | | TM2 is connected in ITW |
All turbo pumps are started. Water system and water signals have been checked. Pumping down on ITW and TM2 is good so far. |