Entry  Friday, March 13, 2015, 13:36, Travis Cave, Spent Target Vault, Standard Operation, , ThO#1, Spent Target Move Storage_Vault_March_13_2015.pdf
The ThO#1 has been placed in the storage vault placed in pail #122 in spot 2B of the vault. It was 6.2mSv/hr upon removal from the south hot cell. see
attached PDF for details.
Entry  Tuesday, March 17, 2015, 10:33, Travis Cave, Spent Target Vault, Standard Operation, , UC#11, Spent Target Move Vault_Storage_March_17_2015.pdf
The spent UC#11 has benn moved from the south hot cell to the spent target vault. See attached PDF for details.
Entry  Thursday, June 29, 2017, 14:42, Travis Cave, Spent Target Vault, Standard Operation, , UC#20, Spent Target Move Vault_Storage_June_29_2017.pdf
 The spent UC#20 has been moved from the south hot cell to the spent target vault. It was placed in pail #150 and spot 1B in the vault. See attached
for details of the vault.
Entry  Thursday, August 03, 2017, 15:02, Travis Cave, Spent Target Vault, Standard Operation, , SiC#36, Spent Target Move Vault_Storage_August_3_2017.pdf
 The spent SiC#36 has been moved from the south hot cell to the spent target vault.
Entry  Monday, November 13, 2017, 13:50, Travis Cave, Spent Target Vault, Standard Operation, , Ta#54, Spent Target Move Target_Index_2017-11-13.pdf
 The spent Ta#54 target has been moved from the south hot cell to the spent target vault. It was placed in Pail #157 and put in spot #5B of the
vault.
Entry  Monday, April 16, 2018, 14:51, Travis Cave, Spent Target Vault, Standard Operation, , Ta#55, Spent Target Move 
 Ta#55 has been moved from the south hot cell to the spent target vault. It was 30.4mSv/hr upon removal from the hotcell, placed in pail #161 and
put in spot 7A of the vault.
Entry  Monday, May 28, 2018, 14:06, Travis Cave, Spent Target Vault, Standard Operation, , SiC#37, Spent Target Move Target_Index_2018-05-28.pdf
 SiC#37 has been moved from the South Hot Cell to the Spent Target Vault. It was placed in Pail #165 and put in spot 3B of the vault and it measured
25.8mSv/hr upon removal from the hot cell. See the attached PDF for details
Entry  Tuesday, July 31, 2018, 11:16, Travis Cave, Spent Target Vault, Standard Operation, , UC#22, Spent Target Move Target_Index_2018-07-30.pdf
 Yesterday the spent UC#22 target was moved from the south hot cell to the spent target vault. It was placed in pail #167 and placed in spot 4A
see attached PDF for details.
Entry  Wednesday, August 01, 2018, 14:48, Travis Cave, Conditioning Station, Standard Operation, TM2, UC#23, Spent Target Move 
 TM#2 with UC#23 has been moved from the south hot cell to the conditioning station.
Entry  Thursday, August 02, 2018, 14:12, Travis Cave, Spent Target Vault, Standard Operation, , Nb#8, Spent Target Move Target_Index_2018-08-02.pdf
 The spent Nb#8 target was moved from the south hot cell to the spent target vault. It was placed in pail #168 and place in spot 2A in the vault.
See the attached pdf for vault details.
Entry  Thursday, August 30, 2018, 11:13, Travis Cave, Spent Target Vault, Standard Operation, , Ta#56, Spent Target Move Target_Index_2018-08-30.pdf
 Ta#56 has been moved from the south hot cell to the storage vault. It was placed in pail#169 and place in slot 2C of the vault. Also the vault
is now full with 24 spent targets and can no longer accept any new targets. See the attached PDF for further details.
Entry  Thursday, September 06, 2018, 10:25, Travis Cave, Spent Target Vault, Standard Operation, , SiC#34, Ta#45,46,47, 50, Spent Target Move 
 Targets SiC#34 , Ta#45,46,47,50 have been moved from the spent target vault to the mini vault.
Entry  Monday, September 24, 2018, 14:50, Travis Cave, Spent Target Vault, Standard Operation, , UC#23, Spent Target Move 
 The spent UC#23 target has been moved from the south hot cell to the spent target storage. It was placed in pail #170 and place in spot #4B in
the vault.
Entry  Friday, October 05, 2018, 14:41, Travis Cave, Spent Target Vault, Standard Operation, , UC#24, Spent Target Move Target_Index_2018-10-05.pdf
 UC#24 has been moved from the south hot cell to the spent target vault. The target is in pail #171 and placed in spot 4C. See attached PDF for
details.
Entry  Monday, November 05, 2018, 08:24, Travis Cave, Spent Target Vault, Standard Operation, , nSiC#1, Spent Target Move Target_Index_2018-11-02.pdf
 The spent nSiC#1 target has been moved from the south hot cell to the spent target vault. It was placed in pail #172 and placed in spot 7B. See
attached PDF for vault details.
Entry  Friday, November 30, 2018, 10:28, Travis Cave, Spent Target Vault, Standard Operation, , Ta#57, Spent Target Move Target_Index_2018-11-30.pdf
 The spent Ta#57 target has been moved from the south hot cell to the spent target storage it was placed in pail 174 and placed in spot 8C in the
vault. See attached PDF for details.
Entry  Friday, January 11, 2019, 11:26, Travis Cave, Spent Target Vault, Standard Operation, , UC#25, Spent Target Move Target_Index_2019-01-11.pdf
 The spent target in the south hot cell has been moved to the spent target vault. It was placed in pail 204 and placed in spot 6B. The pail is made
of thicker steel and thus will not need to be repackaged later.  The ISAC spent target vault is full there is no more room for any more targets.
Entry  Thursday, May 02, 2019, 09:37, Travis Cave, Spent Target Vault, Standard Operation, , UC#26, Spent Target Move Target_Index_2019-05-02.pdf
 The spent UC#26 target was moved from the south hot cell to the spent target vault. It was place in pail #209 and put in spot 1A in the vault and
was 2.42mSv/hr upon removal from the south hot cell.
Entry  Thursday, October 03, 2019, 10:25, Travis Cave, Spent Target Vault, Standard Operation, , ZrC#8, Spent Target Move Target_Index_2019-10-02.pdf
 The spent ZrC#8 was moved from the south hot cell to the spent target vault. It was placed in pail 217 and the pail was placed in slot 3A of the
vault, it was 205mSv/hr when removed from the hot cell. Also the pail was filled with junk stuff that included 
wire, a wire scanner, IMG guage, target bolts and a water block bolts. Also there are only two spots left in the vault.
Entry  Wednesday, October 09, 2019, 13:28, Travis Cave, Spent Target Vault, Standard Operation, , UC#27, Spent Target Move Target_Index_2019-10-09.pdf
 The spent target in the south hot cell has been moved to the spent target vault. It was placed in spot 1B of the vault in pail number 218. See
attached for vault details.