1760
|
Tuesday, July 31, 2018, 11:16 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#22 | Spent Target Move |
Yesterday the spent UC#22 target was moved from the south hot cell to the spent target vault. It was placed in pail #167 and placed in spot 4A see attached PDF for details. |
Attachment 1: Target_Index_2018-07-30.pdf
|
|
1762
|
Wednesday, August 01, 2018, 14:48 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | UC#23 | Spent Target Move |
TM#2 with UC#23 has been moved from the south hot cell to the conditioning station. |
1765
|
Thursday, August 02, 2018, 14:12 |
Travis Cave | Spent Target Vault | Standard Operation | | Nb#8 | Spent Target Move |
The spent Nb#8 target was moved from the south hot cell to the spent target vault. It was placed in pail #168 and place in spot 2A in the vault. See the attached pdf for vault details. |
Attachment 1: Target_Index_2018-08-02.pdf
|
|
1773
|
Thursday, August 30, 2018, 11:13 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#56 | Spent Target Move |
Ta#56 has been moved from the south hot cell to the storage vault. It was placed in pail#169 and place in slot 2C of the vault. Also the vault is now full with 24 spent targets and can no longer accept any new targets. See the attached PDF for further details. |
Attachment 1: Target_Index_2018-08-30.pdf
|
|
1777
|
Thursday, September 06, 2018, 10:25 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#34, Ta#45,46,47, 50 | Spent Target Move |
Targets SiC#34 , Ta#45,46,47,50 have been moved from the spent target vault to the mini vault. |
1791
|
Monday, September 24, 2018, 14:50 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#23 | Spent Target Move |
The spent UC#23 target has been moved from the south hot cell to the spent target storage. It was placed in pail #170 and place in spot #4B in the vault. |
1800
|
Friday, October 05, 2018, 14:41 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#24 | Spent Target Move |
UC#24 has been moved from the south hot cell to the spent target vault. The target is in pail #171 and placed in spot 4C. See attached PDF for details. |
Attachment 1: Target_Index_2018-10-05.pdf
|
|
1816
|
Monday, November 05, 2018, 08:24 |
Travis Cave | Spent Target Vault | Standard Operation | | nSiC#1 | Spent Target Move |
The spent nSiC#1 target has been moved from the south hot cell to the spent target vault. It was placed in pail #172 and placed in spot 7B. See attached PDF for vault details. |
Attachment 1: Target_Index_2018-11-02.pdf
|
|
1834
|
Friday, November 30, 2018, 10:28 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#57 | Spent Target Move |
The spent Ta#57 target has been moved from the south hot cell to the spent target storage it was placed in pail 174 and placed in spot 8C in the vault. See attached PDF for details. |
Attachment 1: Target_Index_2018-11-30.pdf
|
|
1855
|
Friday, January 11, 2019, 11:26 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#25 | Spent Target Move |
The spent target in the south hot cell has been moved to the spent target vault. It was placed in pail 204 and placed in spot 6B. The pail is made of thicker steel and thus will not need to be repackaged later. The ISAC spent target vault is full there is no more room for any more targets. |
Attachment 1: Target_Index_2019-01-11.pdf
|
|
1916
|
Thursday, May 02, 2019, 09:37 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#26 | Spent Target Move |
The spent UC#26 target was moved from the south hot cell to the spent target vault. It was place in pail #209 and put in spot 1A in the vault and was 2.42mSv/hr upon removal from the south hot cell. |
Attachment 1: Target_Index_2019-05-02.pdf
|
|
1998
|
Thursday, October 03, 2019, 10:25 |
Travis Cave | Spent Target Vault | Standard Operation | | ZrC#8 | Spent Target Move |
The spent ZrC#8 was moved from the south hot cell to the spent target vault. It was placed in pail 217 and the pail was placed in slot 3A of the vault, it was 205mSv/hr when removed from the hot cell. Also the pail was filled with junk stuff that included
wire, a wire scanner, IMG guage, target bolts and a water block bolts. Also there are only two spots left in the vault. |
Attachment 1: Target_Index_2019-10-02.pdf
|
|
2005
|
Wednesday, October 09, 2019, 13:28 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#27 | Spent Target Move |
The spent target in the south hot cell has been moved to the spent target vault. It was placed in spot 1B of the vault in pail number 218. See attached for vault details. |
Attachment 1: Target_Index_2019-10-09.pdf
|
|
2015
|
Monday, October 28, 2019, 11:50 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#28 | Spent Target Move |
UC#28 has been moved from the south hot cell to spent target storage. The target was placed in pail number 219 and placed in spot 1C of the vault, it was 12.6mSv/hr upon removal from the south hot cell. Also the spent target vault is now full and can not currently accept anymore targets. |
Attachment 1: Target_Index_2019-10-28.pdf
|
|
2028
|
Tuesday, November 12, 2019, 10:07 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#59 | Spent Target Move |
The spent Ta#59 was moved from the south hot cell to the spent target vault. See the attached for details. |
Attachment 1: Target_Index_2019-11-08.pdf
|
|
2141
|
Thursday, August 27, 2020, 11:14 |
Travis Cave | Spent Target Vault | Standard Operation | | Graphite #1 | Spent Target Move |
Graphite #1 along with the broke 2A2M19 wire scanner have been placed in the spent target vault see attached PDF for deatails. |
Attachment 1: Target_Index_2020-08-27.pdf
|
|
2147
|
Thursday, September 24, 2020, 10:34 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#30 | Spent Target Move |
UC#30 has been placed into the spent target vault, it was placed in pail 238 and in spot 1A of the vault. It was 81.5 mSv/hr when removed from the south hot cell. |
Attachment 1: Target_Index_2020-09-24.pdf
|
|
2163
|
Thursday, November 12, 2020, 10:02 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#31 | Spent Target Move |
UC#31 has been moved from the south hot cell to the spent target vault. It is in spot 8B of the vault in pail # 224 and was 3.71mSv/hr upon removal from the south hot cell. |
2167
|
Thursday, November 19, 2020, 12:00 |
Adam Newsome | Spent Target Vault | Standard Operation | | C#2 | Spent Target Move |
C#2 has been moved from the south hot cell to the spent target vault. It is in spot 8A of the vault in pail # 235 and was 185 mSv/hr upon removal from the south hot cell.
The Target Index spreadsheet has been updated on DocuShare. |
2239
|
Friday, August 06, 2021, 11:52 |
Travis Cave | North Hot-Cell | Standard Operation | | UC#33 | Spent Target Move |
UC#33 has been packed and moved from the north hot cell to the spent target vault. See attached PDF for
deatails |
Attachment 1: Target_Index_2021-08-06.pdf
|
|