ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
976
|
Friday, July 03, 2015, 09:11 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module moved |
TM#2 has been moved from the conditioning station to the south hot cell. |
987
|
Thursday, July 09, 2015, 09:55 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module moved |
TM#2 has been moved from the south hot to the north east silo. TM#1 has been moved from the south west silo to the conditioning station. |
993
|
Monday, July 13, 2015, 11:31 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | no target | Module moved |
TM#1 has been moved back to the south west silo from the conditioning station. |
994
|
Tuesday, July 14, 2015, 08:42 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module moved |
TM#2, no target, has been moved from the north east silo to the south hot cell. |
1004
|
Tuesday, July 21, 2015, 09:21 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Electrical Check Failed |
TM#2 has failed the electrical check see attached pdf for details. |
1008
|
Wednesday, July 22, 2015, 11:31 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Electrical Check |
Electrical check done on TM#2 around the 25th of June 2015, this was before the coil line leak was found. |
1012
|
Friday, July 24, 2015, 14:41 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module moved |
TM#2 has been moved from the south hot cell to north east silo. |
1030
|
Thursday, August 06, 2015, 11:40 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module moved |
TM#2 is now in the south hot cell |
1064
|
Wednesday, September 09, 2015, 09:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Module moved |
TM#1 has been moved from the south west silo to the south hot cell. |
1070
|
Thursday, September 17, 2015, 09:01 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Module moved |
TM#1 has been moved from the south hot cell to the north east silo. |
1087
|
Wednesday, September 30, 2015, 08:50 |
Travis Cave | South Hot-Cell | Maintenance | TM3 | no target | Module moved |
TM#3 is in the south hot cell it was moved from the north west silo. |
1088
|
Wednesday, September 30, 2015, 11:14 |
Travis Cave | South Hot-Cell | Repair | TM3 | no target | Electrical Check |
TM#3 electrical check at the south hot cell, no target, all value are done at 1000Volts. See the attached PDF for the results. |
1103
|
Thursday, October 15, 2015, 08:07 |
David Wang | South Hot-Cell | Standard Operation | TM2 | no target | TM2 no target electrical check at SHC. |
I did a TM2 no target electrical check at SHC this morning. A to RU at 500v is 250K which is low. anode- x pin is dead short to 60kv bias. RU is dead short to 60kv bias( as before). see attachment |
1116
|
Thursday, November 05, 2015, 09:57 |
Travis Cave | Conditioning Station | Maintenance | TM3 | no target | Module moved |
TM#3 has been moved from the north west silo to the conditioning station. |
1128
|
Monday, November 16, 2015, 13:59 |
Travis Cave | Conditioning Station | Maintenance | TM3 | no target | Module moved |
TM#3 has been moved back to the NW silo. |
1169
|
Friday, March 18, 2016, 08:34 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | module moved |
TM#2 with no target has been moved to the conditioning station from the south hot cell. |
1178
|
Wednesday, March 23, 2016, 11:00 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module moved |
TM#2 was moved into the south hot cell by 08:30. |
1181
|
Thursday, March 24, 2016, 13:55 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | no target | module moved |
TM#2 has been moved from the south hot cell to the south west silo and TM#1 was moved from the north east silo to the conditioning station. All done by 10AM. |
1184
|
Wednesday, March 30, 2016, 11:00 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | no target | Electrical Check |
The results of the TM#1 electrical check from the 29th of March 2016 |
1208
|
Wednesday, April 13, 2016, 10:14 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | module moved |
TM#2 has been moved from the south west silo to the conditioning station. |