Entry  Wednesday, August 17, 2011, 13:09, Bevan Moss, ITW, Standard Operation, TM1, Ta #37, TM1 move from ITW to Hot Cell 

 TM1 with Ta #37 target was moved from ITW to the south hot cell. The rotation of TM1 may have been off slightly during the final removal from ITW but it was minimal. Entry into the south hot cell went with out incident. This was my first time moving the module without the presence of Travis Cave. 

Entry  Thursday, July 09, 2015, 14:02, David Wang, Conditioning Station, Development, TM1, , TM1 is pumping down at CS 

TM1 and CS  vacuum system are connected. All turbo-pumps are started. The new TP1S works fine also. The pumping down looks good so far. During the TM1 and CS roughing down time, Joe .M noticed a Rn-220 level surge up in TH . Then,the Rn220  level slowly dropped back. Anders suspected this Rn-220 surging is related to the TM1 roughing down at CS. We decided we will stop the pumps , vent the CS , and roughing  again tomorrow. During the same time Joe will monitor  Rn-220 level in TH to see if the surging is repeatable. We want to learn more on this TH Rn-220 issue.

Entry  Monday, September 08, 2014, 13:44, David Wang, Conditioning Station, Standard Operation, TM1, ZrC#6, TM1 is disconnected at CS. 

Stopped TM1 and CS turbo pumps. Disconnected TM1 at CS. The CS and TM1 are under vacuum and naturally leak up. I will vent it on Wednesday morning.

Entry  Thursday, September 04, 2014, 11:19, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 is connected in CS. 

TM1 is connected in CS. All turbo pumps are started.

Entry  Wednesday, May 22, 2019, 11:52, David Wang, Conditioning Station, Maintenance, TM1, , TM1 inpsection. 

TM1 shielding plates and their holding bolts are inspected. No corrosion.  TM1 is located at TCS now. Both TP1 and TP2 are started.

Entry  Thursday, July 09, 2015, 13:17, Anders Mjos, Conditioning Station, Standard Operation, TM1, , TM1 in TCS for alpha contamination test 

 Thursday, July 09, 2015, 13:17: Water package started.

Thursday, July 09, 2015, 15:20: Water package stopped.


Friday, July 10, 2015, 14:15: Roughing with new pump

Entry  Tuesday, July 31, 2012, 12:50, David Wang, South Hot-Cell, Standard Operation, TM1, UC x, TM1 heat shield circuit leak check with UC x target 

Chad and i did a leak check on TM1heat shield with UCx target on.The circuit are pumped  down to the bottom leak rate and base pressure is 3xE-3 torr on the leak detector. There are two VCR caps on heat shield circuit. Chad sprayed helium on both of them   ( tested individually,2 seconds every time ) . The test repeated 1 time.There is no response on leak detector during 45 seconds waiting time on both time.Chad flushed helium around the target for 15 second. During 1 minutes waiting time , there is no response on leak detector.The heat shield circuit is leak tight at this stage. It will be helium pressure  in CS later.

Entry  Wednesday, November 07, 2012, 11:09, David Wang, South Hot-Cell, Standard Operation, TM1, TiC , TM1 heat shield circuit leak check with TiC target at hot cell 

Chad and i did a leak check on TM1(Lp-TiC) heat shield water circuit at south hot cell. There is no leak had been found on it. The circuit  is leak tight at present. I will do  helium pressure check on this circuit at  conditioning station once the vacuum is good enough.

Entry  Tuesday, April 24, 2012, 10:38, David Wang, Conditioning Station, Standard Operation, TM1, LP SIS Nb6, TM1 heat shield circuit leak check with Nb5 

 The pumping down on TM1 and conditioning station is fine over the weed end. The PNG 1(containment box) is 2.4xe-6 Torr, the IG1 (top service cap) is 9.0 xE-7 Torr, and the IG4 is 1.9xE-6Torr (diagnostic box). At this pressure, I connected the leak detector to the system and applied 80psi helium to the heat shield circuit. The leak rate and base pressure on leak detector are 0.0xE-9 Atm.cc/sec and 0.0xE-4Torr. There is no any response on leak detector during 4mins helium applying time. So the heat shield and Nb5 target water circuit is completely leak tight.

Entry  Friday, April 08, 2016, 07:13, David Wang, ITW, Standard Operation, TM1, UCx15, TM1 has been connected in ITW. 

After ITW HV test is done, TM1 has been connected to ITW. Water signals are checked in electrical room. They are good.

Entry  Wednesday, September 10, 2014, 11:47, David Wang, ITW, Standard Operation, TM1, , TM1 has been connected in ITW. 

TM1 has been connected in ITW.  ITW and TM1 turbo pumps have been started. Water is supplied to TM1 only. Everything is good so far.

Entry  Thursday, November 06, 2014, 08:07, David Wang, ITW, Standard Operation, TM1, ThO#1, TM1 has been connected in ITW. 

TM1 has been connected in ITW. All turbo pumps are started. The pumping down on ITW is good so far. The water is supplied to TM1 for HV conditioning.

Entry  Tuesday, April 28, 2015, 17:17, David Wang, ITW, Standard Operation, TM1, UCx12, TM1 has been connected in ITW. 

TM1 has been connected in ITW. Five turbo pumps have  been started. The TM1 containment box window line is capped on the service cap and the line is pump town to E-4 torr range.

Entry  Thursday, March 06, 2014, 06:28, David Wang, Conditioning Station, Maintenance, TM1, , TM1 had been moved from silo to CS 

TM1 has been successfully moved from silo to CS. The CS vacuum system is connected  to TM1. Turbo pumps on TM1 and CS have been started yesterday afternoon . The starting of TM1 turbos was easy. The pumping down over night is good so far.

Entry  Wednesday, July 16, 2014, 11:28, David Wang, ITW, Standard Operation, TM1, , TM1 had been dsiconnected in ITW. 

The TM1 and ITW  were vented with argon gas last night. TM1 had been disconnected in ITW this morning.

Entry  Monday, November 21, 2011, 13:49, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 full leak check in conditioning station 

TM1 full leak check in conditioning station has been fulfilled this morning.Both air to vacuum leak check and waterlines helium 80psi pressure test are fine.The result:

Air to vacuum helium spray:base leak rate on leak detector 1.6x E-9 atm .cc/sec.base pressure0.0xE-4 torr. sprayed helium around all flanges, turbo pumps,panels,bellow,insulation stands, gauges. No Response on leak detector. Air to vacuum seals on TM1 is leak tight.

Helium pressure test on all water lines.with 80 psi helium 3minutes test:

        PNG1 :2.4XE-7torr .PNG4 :2.6x E-6torr . IG1 :5.1xE-7torr.

A :target oven(+)  BL:2.0xE-9 atm.cc/sec .First minute no response,then climbed to1.9xE-8 atm.cc/sec. Stabled at 1.9xE-8 atm.cc/sec to 3 minutes.

B:target oven(-)    BL:5.5x E-9 atm.cc/sec.First 80 seconds no response, then climbed to 1.8xE-8atm.cc/sec. Stabled at 1.8xE-8atm.cc/sec to 3 minutes.

C:tube heater(-)   BL:8.0xE-9 atm.cc/sec .First minute no response ,then climbed to 2.7xE-8 atm.cc/sec. Stabled at 2.7x E-8 atm.cc /sec to 3 minutes.

D: tube heater(+) BL: 1.0xE-8 atm.cc/sec. First minute no response , then climbed to 1.8xE-8 atm.cc/sec. Stabled at 1.8x E-8 atm.cc/sec to 3minutes.

G:EE  BL:1.0xE-8 atm.cc/sec .First 1.5 minutes no response , then climbed to 1.7x E-8 atm.cc/sec. Stabled at 1.7x E-8atm.cc/sec to 3minutes.

F:heat shield   BL:1.2x E-8 atm.cc/sec. First  1.5 minutes no response , then climbed to 1.9 xE-8 atm.cc/sec. Stabled at 1.9 xE-8 atm.cc/sec to 4 minutes. Total test time 4 minutes.

I: mounting plate    BL:1.2 x E-8 atm.cc/sec.     NO RESPONSE on leak detector  in 3minutes.

M: window   BL:1.2x E-8 atm.cc/sec First 1.5 minutes  no response,then climbed to 2.0xE-8 atm.cc/sec . Stabled at 2.0xE-8 atm.cc/sec to 3minutes.

The base pressure on leak detector stayed at 0.0x E-9 torr through all the test, and no pressure response on high vacuum gauges.

Entry  Wednesday, June 06, 2012, 08:21, David Wang, ITW, Standard Operation, TM1, , TM1 disconnected in ITW 

I disconnected TM1 in ITW yesterday morning.The general radioactive level in ITW over the TM top (300mm) is about 350 usv/hr. contacting level on TP1 and TP2 are 1.0-1.2 msv/hr. I took 0.22 msv dose .The module is moved to

south hot cell later and a shielding plug is put back to ITW. Everything is fine.

Entry  Tuesday, July 31, 2012, 09:52, David Wang, ITW, Standard Operation, TM1, Ta38, TM1 disconnected in ITW 

I disconnected TM1 in ITW.  Heat shield line has been purged .

Entry  Wednesday, September 12, 2012, 11:59, David Wang, ITW, Standard Operation, TM1, UCx, TM1 disconnected in ITW 

I removed 5 shielding blocks from ITW to block storage area, and disconnected TM1 in ITW. After UCx run,  the radioactive level around the turbo pumps and primary vacuum lines are pretty high. This affect the general field inside the ITW pit around working area.i took 15 minuts to finish the job and i got 0.1msvr dose. the general field around my working area is about 350 usv/h.

Entry  Tuesday, November 06, 2012, 12:08, David Wang, ITW, Standard Operation, TM1, Nb#7, TM1 disconnected in ITW 

Bevan and I disconnected TM1 in ITW this morning. The TM1 was moved to south hot cell later.   